a VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPEPATING REPORT MONTH 0ctober YEAR 1979 SUBMITTED:
Mb LMem W SUPERIi4TEtiDENT - OPERATIONS APPROVED:
MANAGER ()
' T I; '
)bb 7911200 h
OPERATING DATA REPORT I D DOCKET NO.
50-338 DATE 11-5-79 C051PLETED BY W. R. Madison TELEPHONE 703)894-5151 OPERATING STATUS
- 1. Unit Name:
florth Anna,' Unit 1 Notes.
- 2. Reporting Period: Ortnhor 14 3.. Licensed Thermal Power (51Wr): 2776 94/
- 4. Nameplate Rating (Gross 51We):
S. Design Electrical Rating (Net 51We): 907
- 6. >!aximum Dependable Capacity (Gross 51We): 928
- 7. 31aximum Dependable Capacity (Net SIWE):
898
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
fi/A
- 9. Power Level To Which Restricted,If Any (Net 5tWe):
N/A
- 10. Reasons For Restrie: Ions,If Any:
N/A
~
This afonth Yr.-to-Date Cumulative 745 7,296 12,313
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critica!
O 5,478.4 10,525.2
- 13. Reactor Reserve Shutdown Hours 0
51.5 148.T~
- 14. Hours cenerator On-Line 0
5,401.5 10,053.2
- 15. Unit Rewrve Shutdown Hours 0
0 0
- 16. Gross The: mal Enecy Generated (51WH) 0 21.083.118 26,279,913
- 17. Gross E!ectrical Enecy Generated (5f WH) 0 4,188,866 7,853,445_
4,445,776 8,346,3?9
- 13. Net Electrical Energy Generated (31WH) 0
- 19. Unit Service Factor 0
74.0 81.6
- 20. Unit Availability Factor 0
74.0 81.6 0
63.9
/I.0
- 21. Unit Capacity Factor (Using 31DC Net)
- 22. Unit Capacity Factor (Using DER Net) 0 63.3 70.3 0
4.8 3.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date,and Duration of Each):
fl/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
December 17,1979
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY CO31)lERCIAL OPER ATION (of 73 17/5
\\,) 0,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-338 NAl UNIT 11-5-79 DATE W. R. Madison COMPLETED BY (703) 894-5151 TELEPHONE October 1979 MONE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
0
,7 0
0 2
is 3
0 0
,9 0
0 4
20 0
0 5
21 0
0 6
22 0
0 7
73 0
8 24 0
0 9
25 0
0 10 26 0
0 11 27 0
0 12 28 0
0 13 29 0
0 14 3g 0
o 15 3,
0-16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whcle megawatt.
(9/77)
'7(*
l3b
h DOCKET NO.
50-338 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNITNAME _ fiorth Anna 1 DA1 E 11-5-79 COMPLE D !!Y I
REPORT MONTil October 1979 E
n.
2 2
.$ 7
'h j h* 5 Licensee it, jvt Cause & Cor rective No.
Date R
~g s
j -3 5 Event gy g3 Action to c:
lleport It vi u U
Present Recurrence H
jE 5
3 ;f3 o
g u
e O
Shutdown 79-18 continued through Oc ;ober.
Durati on was 745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> 5
1 2
3 4
4 3 F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data II. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI (LER) File (NUREG-Y D-Regulatory Restriction 4 Other (Explain) 0161)
C' E Operator Training & Ucense Examination F Administrative 5
G-Operational Er ror (Explain)
Exhibit I Same Source I'l/77)