a VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPEPATING REPORT MONTH 0ctober YEAR 1979 SUBMITTED:

Mb LMem W SUPERIi4TEtiDENT - OPERATIONS APPROVED:

MANAGER ()

' T I; '

)bb 7911200 h

OPERATING DATA REPORT I D DOCKET NO.

50-338 DATE 11-5-79 C051PLETED BY W. R. Madison TELEPHONE 703)894-5151 OPERATING STATUS

1. Unit Name:

florth Anna,' Unit 1 Notes.

2. Reporting Period: Ortnhor 14 3.. Licensed Thermal Power (51Wr): 2776 94/
4. Nameplate Rating (Gross 51We):

S. Design Electrical Rating (Net 51We): 907

6. >!aximum Dependable Capacity (Gross 51We): 928
7. 31aximum Dependable Capacity (Net SIWE):

898

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

fi/A

9. Power Level To Which Restricted,If Any (Net 5tWe):

N/A

10. Reasons For Restrie: Ions,If Any:

N/A

~

This afonth Yr.-to-Date Cumulative 745 7,296 12,313

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critica!

O 5,478.4 10,525.2

13. Reactor Reserve Shutdown Hours 0

51.5 148.T~

14. Hours cenerator On-Line 0

5,401.5 10,053.2

15. Unit Rewrve Shutdown Hours 0

0 0

16. Gross The: mal Enecy Generated (51WH) 0 21.083.118 26,279,913
17. Gross E!ectrical Enecy Generated (5f WH) 0 4,188,866 7,853,445_

4,445,776 8,346,3?9

13. Net Electrical Energy Generated (31WH) 0
19. Unit Service Factor 0

74.0 81.6

20. Unit Availability Factor 0

74.0 81.6 0

63.9

/I.0

21. Unit Capacity Factor (Using 31DC Net)
22. Unit Capacity Factor (Using DER Net) 0 63.3 70.3 0

4.8 3.3

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date,and Duration of Each):

fl/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

December 17,1979

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY CO31)lERCIAL OPER ATION (of 73 17/5

\\,) 0,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-338 NAl UNIT 11-5-79 DATE W. R. Madison COMPLETED BY (703) 894-5151 TELEPHONE October 1979 MONE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

0

,7 0

0 2

is 3

0 0

,9 0

0 4

20 0

0 5

21 0

0 6

22 0

0 7

73 0

8 24 0

0 9

25 0

0 10 26 0

0 11 27 0

0 12 28 0

0 13 29 0

0 14 3g 0

o 15 3,

0-16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whcle megawatt.

(9/77)

'7(*

l3b

h DOCKET NO.

50-338 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNITNAME _ fiorth Anna 1 DA1 E 11-5-79 COMPLE D !!Y I

REPORT MONTil October 1979 E

n.

2 2

.$ 7

'h j h* 5 Licensee it, jvt Cause & Cor rective No.

Date R

~g s

j -3 5 Event gy g3 Action to c:

lleport It vi u U

Present Recurrence H

jE 5

3 ;f3 o

g u

e O

Shutdown 79-18 continued through Oc ;ober.

Durati on was 745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> 5

1 2

3 4

4 3 F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain)

I-Manual for Preparation of Data II. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event ReporI (LER) File (NUREG-Y D-Regulatory Restriction 4 Other (Explain) 0161)

C' E Operator Training & Ucense Examination F Administrative 5

G-Operational Er ror (Explain)

Exhibit I Same Source I'l/77)

Il Other (Explain)