D**D
- D T
ow o
.22 NRC somu 173 u s. nucle Aa ancVi.AToav couuissioN omos a Nuusta (2 78) 20- 80=3 STANDARD ORDER FOR DOE WORK 10/11/79 ISSUED TO. (CCE Cfficel ISSUED SY: IN AC Office)
ACCOUNTING CITATION APaRope ATION svueci Brookhaven Area Office Office of Nuclear Reactor 31X0200.200 Regulation
==Nv..
PERFORMING ORGANB1ATION AND LOCATION 20-19-01-03 FIN NUM BE R Brookhaven National Laboratory A-3117 WORK PERICO THIS ORDER FIN TITLE fixed C ESTIMATED E FRCM:
TO:
Inservice Inspection 10/1/79 9/30/30 OBLIGATION AVAILABILITY PROVIDED BY:
A.
THiS CRcER S 25,000 8 TOTAL CF CACERS PLACEO *a C A TO THIS O ATE MTM THE PE AFCAMING C AG ANIC ATICN uNCER THE SAMe - Ana=CPRI ATICN SYMSCL
75,000
'1& A NUMS Ea" Cl?EO A8Cvc C. TOTAL ORCERS TO D? 2 (TOTAL A & 8)
S 100,000 0 AMOUNT INCLUCED IN "C" APPUCASLE TO THE " FIN NUMBE R" CITED IN THIS OR CE R.
S 25,000 FINANCIAL FLEXI8tLITY:
Q FUNCS WILL NOT BE REPROGRAMMEO SETWE' N clNS. LINE O CONSTITUTES A UMITATION CN 08LIGATICNS
O FUNCS MAY SE REP 40GRAMMED NCT TO EXCEEO : 10% OF FIN, EL UP TO $5CK. LINE C CONSTITUTES A LIMITATiCN ON C8LIGATICNS AUTHCRIZEO.
STANDARD TERMS AND CONCITIONS PROVICEC CCE ARE CONSIDEFEO PART OF THl3 CRCER UNLESS OTHERW(SE NOTED.
ATTACHMENTS.
THE FCLLOWING ATTACHMENTS ARE HERE8Y SECU AITY:
MACE A PART CF THIS CRCE9:
C WCRK CN THIS CRCER IS NCT CLASSIFIEO.
C STATEMENT OF WOR K C WCRK CN THIS CRCER INVCLVES CLASSIFIEO C ACCITICNAL TERMS AND CONDIT!CNS INFCRMATICN. NRC FCRM 187 IS AT*ACHEC.
After signature, please send cccy of this order to M. Paulette Triplett, NRR, P-J28.
ISSUING AUTHORITY l
ACCEPTING ORGANIZATION i
sic N A ru a s n
i sicN A Tuat M. Paulette Triolett.4/ t'.
n _ s..,. 7l M ! cal Assistant
.. /, '.
c.-
A E NRC FORM 173 (2 78) 13/2 191 7011200 67 4
ENCLOSURE 1 SCOPE OF WORK Technical Assistance on Inservice Testing Programs Review as required by 10 CFR 50.55a(g).
BNL will provide technical assistance to the DOR staff in the review of Inservice Testing Program for pumps and valves as required by 10 CFR 50.55a(g. The review will include the review of proposed and updated programs for the following power stations:
Connecticut Yankee Cooper Indian Point 2 San Onofre Three Mile Island Kewaunee Yankee Rowe Browns Ferry 1, 2, 3 FitzPatrick Arkansas 1 Point Beach 1, 2 Pilgrim 1 The program objective is to provide recomendations to the staff for use in their evaluation of the licensee's proposed and periodically updated inservice testing program to assure compliance with the regulations.
The scope of the work includes:
a) Evaluating the technical basis for relief requested by the licensee from ASME Section XI Code requirements that are deternined to be impractical for his facility.
b) Provide input for round one questions which will be transmitted to the licensee to request additional information, c) Evaluating the licensee's responses and participating in meetings with the NRC and the licensee to resolve further differences.
This may involve trips to the plant or the NRC to have meetings with the licensee.
d) Prepare a written inout to the Safety Evaluation Report on the proposed inservice testing programs.
e) Review licensee's supplemental reports and provide recommendations to the staff.
In addition to the technical review, SNL will assist the staff in on-call areas to clarify governing dccuments, respond to ACRS requests for information, and apcear at hearings in defense of application of staff positions.
1372 192
MILESTONES TASK DEC 79 MAR 80 JUN 80 Task I
- 1) Cooper e)
A Task 2
- 2) Ccnnecticut Yankee e)
A Task 3
- 3) Yankee Rcwe e)
A Task 4
- 4) Kewaunee e)
A Task 5
- 5) Brcwns Ferry 1, 2, 3 e) 2 Task 6
- 6) Arkansas 1
\\ ((.
\\
MILESTCNES TASK DEC 79 MAF,30 JUN 30 Task 7
- 7) Three Mile Island I e)
A Task 3
- 8) San Onofre I e)
A Task 9 9)
Indian Point 2 d)
A e)
A Task 10
- 10) Fit: Patrick d)
A e) a 1372 194
MILESTONES TASK DEC 79 MAR 20 JUN SO Task 11
- 11) Point Beach 1. 2
~.
b) a c) 3 d) i e) s Task 12
- 12) Pilgrim 1 d)
.e)
/
1372 195