k Rev. 1 - 11/9/79 d
OPERATING DATA REPORT DOCKET NO. 50-346 DATE vetocer 0,
1979 CO.\\tPLETED BY J Sto::/C. Berger TELEP110NE 410-233-5000, Er.t.
243 OPERATING STATUS Notes Davis-Besse Unit 1
- 1. Unit Name:
Seo tember. 1979
- 2. Reporting Period:
2772
- 3. Licensed Thermal Power t\\.1Wt):
925
- 4. Nameplate Rating (Gross \\1We):
906
- 5. Design Electrical Rating INet.1We):
\\
to be determined
- 6. 31aximtm Dependable Capacity (Gross. tWe):
5
- 7. 5!axiraum Dependable Capacity (Net 51We):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Repert. Gise Reasons:
- 9. Power Level To which Restricte '. If Any (Net.\\1We):
- 10. Reasons For Restrictions. If Any:
This 51onth Yr to.Date Cumulatise 720 6,551 18,316
- 11. Hours In Reporting Period 634.95 3,624.4 10.256.2
- 12. Number Of Hours Reactor Was Critical 85.05 1,943.3 2,733.6
- 13. Reactor Resene Shutdown Hours 604.1 3,503 9,236.2
- 14. Ilours Generator On.Line 0
1,728.2 1,723.2
- 15. Unit Resene Shutdown Hours 1
- 16. Gross Thermal Energy Generated 15tWH) 1.519.486 8.651.148 18,93g_713 503,791 2.381.lES 6.264.943
- 17. Gross Electrical Energy Generated i5thit) 477,780 2,714,007 5.755.467
- 18. Net Electrical Energy Generated (51WH)
- 19. Unit Senice Factor 83.9 53.5 50.4 83.9 79.9 59.9
- 20. Unit Availability Factor to be determined
- 21. Unit Capacity Factor tUsin;.\\lDC Net) 73.2 45.7 34.7
- 22. Unit Capacity Factor (Using DER Net) 8.8 3.9 19.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6.\\lonths (Type. Date,and Duration of Each):
Refueling outace to start March 15. 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY C05t51ERCIAL OPER ATION 1321 g o3 M
,7g
Rey. 1 - 11/9/79 i
1 50-346 DOCKET NO.
UNIT SilUTDOWNS AND IOW!:. t REDUCllONS UNIT N AME Dav is-Hesse JJnit 1 j
DAIE Octolmr 8-1979 COMPl.E1 ED itY
.lan St at 7/fC;1LL Berger REPORT MON ill September, 979 ll:t.l.PilONE 419-259-5000. Ext. 243 1
3
.!"E 3
.h h Licensec 5 t, Cause & Corrective g
3 Action to N e.
Date 9
3g g
,g g 5 Ev::nt aT
$E ld js 5, c Report a N0 5'
Pievent itecurrence o
g o
1l 11 79 09 07 S
58.0 B
1 NA NA NA Maintenance outage to find steam leak in containment.
12 79 09 18-F 17.2 A
3 NA NA NA Sticking, pump pressure controller on No. 2 electro-hydraulic control pump.
Controller to be disassembled and cleaned at earliest convenience.
13 79 09 23 S
0.0 B
4 NA NA NA Reactor power reduced to 75% to allow maintenance to adjust blowdown on SPl7A2.
1 14 79 09 26 F
40.7 A
3 tIA NA NA Faulty capacitor on turbine throttle pressure transmitter power supply.
3 4
l r0 Method:
Exhibit G. Instructions F: Forced Reason:
1-Manual for l' reparation of Data S: Schedu!ed A. Equipment Failure (Explain)
~
ll. Maintenance of Test 2 Manual Scram.
Entry Sheets for 1.icensee
.I Automatic Scram.
livent Iteport (1. lilt) File (NUREG-U C.Hefueling O
D 1(cgul.itory itestriction i Othes (lisplain) 0161)
U l Operator Training & License Examination 5
1 Admomtrative lAlabit I Same Source G Opciational I nor (thplain)
(9/77) 11 Othen 11 splam)
..