ML19210C483

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1979 & Revised Operating Rept for Sept 1979
ML19210C483
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/09/1979
From: Murray T
TOLEDO EDISON CO.
To: Volgenau E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19210C484 List:
References
L79-1081, NUDOCS 7911140325
Download: ML19210C483 (1)


Text

I f*,

CN r"~~ T J TOLEDO w.J UCMC2d November 9,1979 L79-1081 FILE: RR 2 (P-6-79-10)

Docket No. 50-346 License No. NPF-3 Dr. Ernst Volgenau, Director Of fice of Inspec tion and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Doctor Volgenau:

Monthly Operating Report, October, 1979 Davis-Besse Nuclear Power Station Unit 1 Enclosed find ten (10) copies of the Monthly Operating Report for Davis-Sesse Nuc1 car Power Station Unit 1 for the month of October, 1979.

Also enclosed are revised pages of the Operating Data Report and Unit Shutdowns and Power Reductions for the month of September,1979, which have been revised.

The revisions to these two pages are indicated by a "1" in the lef t margin.

Yours truly, Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosures Mr. James G. Keppler cc:

Regional Director, Region III 'l)2 Encl: 1 Mr. William G. Mcdonald, Director Office of Management Information and Program Control Encl: 2

/100%

/ //

79111403 M - p is THE TOLEDO EDISCN COMPANY EDISCN PLAZA 300 MACISON AVENUE TOLEDO. CHt0 43E52