ML19210B849
| ML19210B849 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/16/1973 |
| From: | Muller D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | John Miller METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7911120546 | |
| Download: ML19210B849 (1) | |
Text
,
DISTRIBUTION:
APR 161973 Local PDR tpdiiket File (ENVIRON)(2)
RP Reading Docket Nos. 50-289 EP-4 Reading and 50-320 HWilchins, OGC DJenkins, EP-4 WHRegan, EP-4 DRMuller, ADEP SSheppard, EP-4 Mr. J. G. Miller RO (3)
Vice President HDenton, SS Hetropolitan Edison Company HJFaulkner, PWR P. O. Box 542 RDeYoung, ADPWR Reading, Pennsylvania 19603 DMacFarlane, ANL PGustafson, ANL
Dear Mr. Miller:
On January 24, 1973, we met with members of your organization to discuss details of the non-radiological technical specifications related to the licensing and operation of the Three Mile Island Nuclear Station, Units 1 and 2.
At that meeting it was agreed that you would submit a revised draf t of these technical specifications to us by March 1,1973. We have not yet received this material.
In order to establish a revised licensing review schedulo, we need a firm estimate of the date the required draft of the technical speci-fications will be available. Please inform us within 7 days after receipt of this letter of the date you will be able to meet.
Sincerely, Original signed by Daniel R. Muller
. Daniel R. Muller, Assistant Director for Environmental Projects Directorate of Licensing cc: Gerald Charnoff Shaw, Pittman, Potts, Trowbridge and Madden 910 - 17th Street, N.W.
Washington, D.C.
20006 n r 'e, 344 m
3
}r,nJ LJr D
.b.-
_ h, a
s s
emer >
L
..........L.; EP.-4 _
L;ADJP tbh a
s SURNAME) s,jj$.,..M ed@R h.k Qt.....
4/13/73 4/fy,/73 4/&/73 om, form AEC-318 (Rev. 9-53) AEGI 0240 a.o
.as-to-s t ess-a uses
~
.7 91112 OS(/f g