Notifies That Response Due Date of 750708 Was Not Met for Gf Murphy 750606 Request for Investigation of Alleged Security Problem at TMI-1.Forwards man-hour Logs Re Total Time Expended in Completing Investigation
ML19210B537
Person / Time
Site: Crane 
Issue date: 08/15/1975
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Gossick L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML19210B535 List:
References
8906, NUDOCS 7911090443
Download: ML19210B537 (3)


Text

'

AUG 15 1975 Note to Lee V. Gossick LETTER FROM GEORGE F. MURPHY DATED JUNE 6, 1975, REQUESTING AN INVESTIGATION OF THE ALLEGED SECURITY PROBLEM AT THREE MILE ISLAND NUCLEAR POWER STATION (REF: DR CONTROL - 8906 DUE: July 8, 1975)

The response due date for the above correspondence was not met because of time required for investigation, preparation of the report, review by IE, NRR, SD, ELD and making the requested revisions. Additional time was involved in clerical effort required for processing of correspondence, concurrences, xeroxing, assembly and dispatch. Please note the enclosed information on the man-hours expcnded in completing this investigation.

C L L[c 0 ll:

4L John G. Davis Deputy Director for Field Operations Office of Inspection and Enforcement

Enclosure:

As stated 1566 088

\\

cc:

g F. A. Dreher

\\

L. N. Underwood

\\

\\

7911090%3

Letter fromE/ci ^ 4 Iuc< li/s/u 8 W. dted

.i Sub$cct $ w 77) d e Uo E dead hi (l/l',' a f L,a hh $ Y0fb/6/~'s$,' 8l$ fl[Sko/79)l $ 96 b ich s-l ORGAfilZATIOil

/ '

HAid HOURS PROFESS 10ilAL CLERICAL j /1/Ed -IE.'/lQs 7%

(% cel,v,ra u - TE /%

4/ riA'# ' ? / D 2A AN

', ((.* /2 0 - T/n, l e.

X. :.< e -. /.

[.* r ~ -

-A y,

s

- Al 52 ls <. < c

kg

\\

f

\\

~

\\

. %M / L ~,i,..,

D

'76 2

/7d v

1566 089 Total 7_66 Total

.S 2 d TOTAL / rf Y 2 4

e--

~~ ~ ~ "[ ~/

SuliS t tHREE MILE TSLANDe. 111'O% : 0. 5.t-21.y/?>-It,

's s

~ _...

Di:i Jij Bu I!... -

g;g g3.,g, P!: oft 5S10::td.

f.! Ii::(:7.'

I U. S. liUCLEAR REGUIATORY CO.WISSION. IE:I HATLS & PIANT PRO.TECTION BRANCH OX, SITE

,249 llRS<

174 HRS.

l TRAVEL 60 llRS, PE-IM'ESTIGATION 33 ERS I

EVALtlATIO::,

EPORT WRITING

& DOCO2hTATI0's EVIEW 420 HRS 1

t e

l 9

s g

\\

\\

\\

1566 090 I

h

.9 7

Total 762 nez. T0tal 174 Hrs.

,,q

. y AA TOTA!.

936 Hrs.

e

\\<