Requests Info on Ring Girder Behavior Relative to Upcoming Reactor Bldg Integrity Test
ML19210B251
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/11/1974
From: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
To: John Miller
METROPOLITAN EDISON CO.
References
NUDOCS 7911040204
Download: ML19210B251 (2)


Text

.....

hY Docket No. 504289 Metropolitan Edison Company ATIN: Mr. John G. Miller Vice President P. O. Box 542 Reading, Pennsylvania Centlement Recently you submitted a report entitled, " Reactor Building Ring Girder Surveillance Report", dated November 1973, to provide us with information on ring girder surveillance.

i We have examined this report along with the proposed Reactor Building structural integrity test and your proposed Technical Specifications, and feel that some action is needed before you conduct the Reactor i

I Building integrity test which, we understand, is scheduled for some time in February.

Because of the repair history of the Three Mile Island Unit 1, ring girder, we believe it is essential to know the nehavior of the ring girder during the integrity test when the concrete is under minimum compressive load.

The November surveillance report indicates no schedule for measurement during the integrity test or later building pressure tests.

Therefore, we request that you provide us with the following infore, tion before you conduct the Reactor Building integrity test:

1.

Describe the procedure which will be used to observe the behavior of the girder during the reactor building integrity test; this procedure should cover at least the observation of deformations, stresses and cracking patterns.

2.

Confirm or cinrify your intent to provide a comparison with predicted deformations, stress and/or strain values before prestressing, during 1585 098 3 th 791104080Zy

,-s

/

y John G. Miller 2-JAN 11 1974 prestreesing and during ar.d af ter the integrity test along with a discussion of any discrepancies between the predicted and the observed values.

Sincerely, i

/ N A. Schwencer, Chief Light Water Reactors Dr. 2-3 Directorate of Licensing cc: George F. Trowbridge, Esquire Shaw, Pittun, Potts & Trowbridge 910 17th Street, NW Washington, D.' C.

20006 DISTRIBUTION:

AEC PDR LOCAL PDR Docket LWR 2-3 Rdg VAMoore DEisenhut RMBernero EIGoulbourne ACRS (16)

OcC R0 (3)

RWKlecker LShao ASchwencer 5 extra cps 1585 099

.L:C/TRyM

-Lic/Lf

-3

- $.hm-h--

-L LShao,Q RMBernero:kmf

.ASchwerg

suanaus, D A'E k h.f......]G....f

.f..-.

YI4 Form AEC.313 (Rev. 9 93) AECM 0240 cro ces es e s ses.: sao.a s4