Requests Extension of Earliest & Latest Completion Dates for CPPR-40 to 740201 & 750201
ML19210B244
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/30/1973
From: John Miller
METROPOLITAN EDISON CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7911040195
Download: ML19210B244 (4)


Text

_. _ _

i AEC DI;

~BUTION FOR PART 50 DOCKET MATE iL

~

' TEMPORARY FORM)

CONTROL NO:

6746 FILE:

FROM:

DATE OF DOC DATE REC'D LTR MEMO RPT OTHER Metropolitan Edison Company Reading, Pennsylvania 19603 8-30-73 9-5-73 x

J. G. Miller TO:

ORIG CC OTHER SENT AEC PDR X

A. Giambusso 1 signed SENT LOCAL PDR X CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

XXX XXX 1

50-289 DESCRIPTION:

ENCLOSURES:

Ltr requesting extension of earliest & latest completion dates for Const. Permit No.

ACItNOWLEDGZD CPPR-40 be extended from 9-30-72 to 2,1-74

& 9-30-73 to 2-1-75.

DO NOT REMOVE PLANT NAME: Three Mile Island, Unit # 1 FOR ACTION /INFORMATION 9-5-73 fod BUTLER (L)

/SCINENCER(L)

ZIEMANN(L)

REGAN(E)

W/ Copies W/8 Copies W/ Copies W/ Copies CLARK (L)

STOLZ(L)

DICKER (E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)

VASSALLO(L)

KNIGHION(E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)

SCHafEL(L)

YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION (e#REGFILE)

TECH REVIEW DENTON A/T IND LIC ASST y at.v rux HENDRIE GRIMES BRAIIMAN OGC, ROOM P-506A SCHROEDER GAMMILL DIGGS (L)

SALTZMAN MUNTZING/ STAFF MACCARY KASTNER GEARIN (L)

CASE KNIGHT BALLARD A OULBOURNE (L)

PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L)

MCDONALD BOYD SHA0 MAIGRET (L)

.A)UBE MOORE (L)(BWR)

STELLO ENVIRO SERVICE (L) y DEYOUNG(L)(PWR)

HOUSTON MULLER SHEPPARD (E)

INFO SKOVHOLT (L)

NOVAK DICKER SMITH (L)

C. MILES P. COLLINS ROSS KNIGHTON

.TEETS (L).

IPPOLITO YOUNGBLOOD WADE (E)

REG OPR TEDESCO 2EGAN WILLIAMS (E)

J ILE & REGION (3)

LONG PROJECT LDR WILSON (L) 585 069 MORRIS LAINAS STEELE BENAROYA HARLESS VOLIRER EXTERNAL DISTRIEUTION i

./l - LOCAL PDR Harrisburg, Pa.

1 - DTIE(ABE:U'ATHY)

(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /LA/NY l - NSIC(BUCF.VIAN) 1-R.Schoonraker CC,GT,D-323 1-GERALD LELLCUCHE 1 - ASLB(YORE /SAYRE/

1-R. CATLIN, E-256-GT BROOKHAVEN NAT. LAB WOODARD/"H" ST.

1-CONSULTANT' S 1-AGMED(WALTER K0 ESTER yl6 - CYS ACRS B:GU1gg Sent 9-5-73 to NEWMARK/BLUME/AGBABIAN RM-C-427-GT E. Goulbourne for 1-GERALD ULRIKSON...ORNL 1

7 9110 d.. MULLER..F-309 GT Dist.

g5 jg

81! M s a\\

/'N 7

6N g:rfs

\\

f55 =" n* roxam d?

R$

.r i\\ be i-w METBOROLITAN*EDi$DN COMPANY

\\$ . Afyt,Ci/

POST OFFid5 9hK542 E kSYLVANIA 19603 DIN TELEPHONE 215 - 929 3601 August 30, 1973 File Cy.-

omitatory Gh h o Deputy Director for Reactor Projects Directorate of Licensing U. S. Atomic Energy Commission Washington, DC 20545

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION UNIT 1 DOCKET NO. 50-289

Dear Mr. Giambusso:

Pursuant to Sectioh 185 of the Atomic Energy Act, as amended,.

and Section 50.55 of the Commission's regulations, Met-Ed reauests that the Commission extend the estimated earliest and latest dates for ccmpletion of construction of Three Mile Island Nuclear Station, Unit 1 from the dates presently set forth in the construction permit CPPR-40 as amended (September 30, 1972 and September 30,1973) to the following dates: February 1, 1974 and February 1, 1975.

Construction progress anticipated in our letter of November 22, 1971 has not been achieved. Numerous changes to the plant and problems encountered on the site, which considered individually may have had little or no effect on schedule, have accumulated to cause significant delay both in release of engineering data and in com-pletion of construction. As has happened with all such projects, many chaages have been required to meet evolving AEC guidelines.

The required construction and engineering man-hours has increased 24% since November 22, 1971.

Listed below are examples of the problems and changes that have required additional construction time:

(1) Electrical circuit quantities increased from 12,000 to 17,000 since November 1971.

(2) Requirements to add orifices and cross connections in the decay heat removal system to comply with the AEC Interim Acceptance Criteria for ECCS.

(3)

Requirements to analyze, fabricate and construct additional restraints in high energy systems external to the reactor building.

(4) Modifications to the main steam relief valvec in light of experience at operating reactors.

1585 070

.,. u;

~.

August 30, 1973 Mr. A. Giambusso Page 2 (5) Addition of a steam generator chemical cleaning system on the recommendation of the Reactor Manufacturer received since November 1971.

(6)

Implementation of system modifications te accommodate the switch to Westinghouse reactor coolant pumps.

(7) Develop ment, fabrication, and installation of in-service inspection equipment and the per-formance of a baseline survey to meet the requirenents of Section XI of the ASME Boiler and Pressure Vessel Code.

(8) Major reduction (20%) of construction force to assure a more effective management control over quality of work as discussed in our letter to Mr. J. P. O'Reilly, AEC, dated December 14, 1972.

(9) Required modifications to reactor vessel internals, instrument tubes, stator jackets, and position indicator tubes as a result of the Oconee I experience.

(10) Analysis, equipment development and f abrication, inspection and resolut ion of thin wall valves in response to AEC letter, dated June 22, 1972.

(11) Analysis, excavation, and repair of reactor containment vessel ring girder.

(12) Untimely system turnover for testing with appropriate analysis and packaging of necessary documentation.

(13) Implementation of requirements for seismic pipe hangers in field run pipe, which required the rerun of considerable pipe.

(14) Late ordering and delivery of vent and drain valves.

(15)

Implementation of vendor stress relief requirements for reactor coolant piping field weld.

(16) Delay in installation of piping and equipment restraints in the reactor building.

(17) Time loss and cleanup effort resulting from effects of a major rain storm occurring in June 1972.

1585 071

August 30, 1973 Mr. A. Giambusso Page 3 The current estimate of completion is considered to be realistic in view of the advanced stage of completion of the project and the performance experienced in schedule discipline during the past six months.

Very truly yours, i

e J. G. Miller Vice P, resident asb cc:

Mr. W. A. Verrochi 1585 072 e