Requests That Util Devise Acceptable Tendon Surveillance Program.Current Program Unacceptable
ML19210B227
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/05/1974
From: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
To: John Miller
METROPOLITAN EDISON CO.
References
NUDOCS 7911040172
Download: ML19210B227 (1)


Text

-

DISTRIBUTION:

AE PDR L cal PDR ocket FEB 5 W4 LWR 2-3 Rdg Docket No. 50-289 RP Rdg VAMoore DEisenhut RMBernero Metropolitan Edison Conpany EIGoulbourne ATTN: Mr. John G. Miller, OGC Vice President P. O. Box 542 go (3)

RWKlecker Reading, Pennsylvania 19603 ASchwencer Centlemen:

ACRS (16) 5 extra cps At the present time your proposed Technical Specifications for Three Mile Island Unit 1 include an Inservice Tendon Surveillance Program (Section 4.4.2.1). The AEC has published guidance for the preparation of these programs as Regulatory cuide 1.35, Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Stnictures (February 5, 1973). As part of your Technical Specifications you will be required to have a tendon surveillance program not necessarily identical to but at least equivalent to the program suggested in Regulatory Guide 1.35.

We have evaluated the program you proposed in Section 4.4.2.1 of the Technical Specifications and find it unacceptable. Please notify us within two weeks of the receipt of this letter of your proposals for an acceptable tendon surveillance program.

Sincerely.

Original Signed by Albert Schwencer A. Schwencer, Chief Light Water Reactors Br. No. 2-3 Directorate of Licensing cc: George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 910 17th Street, P. O. Box 15830 Sacramento, California 95313 37, 7

-7 n

1D0/

de /

M Mdp LWR 2-3.

.../. l 56 q

[

!...O.._L4. 0..,.D._ --... a o,,.c

...RMB e rne r.olkm' L,f,ggp

['

006

.u-.*

IL.') <

/74 ([3/[7g.

X 4

om *

% s o..o.:

Form AEC.318 (Rev. 9 95) AECM 0240 e.o c.s sao.a s4 1911040(77 4