Text
.s u
DISTRIBUTION:
AEC PDR Local PDR Docket JAN 9 1975 ORB #3 rdg KrGoller TJCarter GLear Docket No. 50-289 Illaffe SATeets OGC R0 (3) hbtropolitan Edison Company ATIN: Mr.
R. C. Arnold ACRS (16)
Vice President extra cps P. O. Box 542 JMcGough RBotomore Reading, Pennsylvania 19603 Gentlemen:
As a result of our meeting in Bethesda on Decenber 11, 1974, we request that you review the Babcock and Wilcox (BGW) Standard Technical Specifi-cations (STS).
Five copies of this document have been enclosed for this purpose. 'Ihe initial objective of your review is to provide detailed coments and recomendations for further development of the BQW-STS.
As a second objective, the B4W-SIS will be uniquely conformed and applied, at a later date, for use at ihree Mile Island Unit 1.
As indicated at our meeting, our technical staff will be available to assist you during your review. Informtion regarding B5W's comitment to this effort will be furnishbr to you by separate correspondence.
With regard to your participation in the review, we wish to assure you that we will give careful consideration to all your comments and. recom-mendations; moreover, we will provide appropriate appeal routes for your use when necessary to obtain further discussion on technical specifications that you consider highly over-conservative.
In order that we my coordinate the effort among Metropolimt Edison Company (Meted), B4W, and ourselves, we suggest that the work follow the schedule contained in the enclosure. Should you have any concerns related to this schedule, please advise us so that appmpriate adjust-ments my be made.
Sincerely, Original Signed George Lear, Clief Operating Reactors Branch #3 Directorate of Licensing Frclosures and cc:
lFn7 rrrg 3i) bU
- 5ce next page PR4#3 ORB #3 dg GLear 6%
_.wg O sum = Auc h 1/ 9/
7s _11 ci zs--
8 Forma AEC.)l3 (Re. 9 53) AZCM 0240 W u. s. sove RN M ENT PatNTtNG OFFtCES 9 9 I4* EIO*IOO
,q s n o 4 0 073
. -~s
)
\\
}tr. R. C. Arnold 2-JAN S 1975
Enclosures:
1.
Standard Technical Specifications 2.
Schedulo for Review of BfW-STS i
cc: Pennsylvmia Electric Company Vice President, Technical 1001 Broad Street Johnstown, Pennsylvania 15907 George P. Trowbridge Shae, Pitt: mar., Potts and Trowbridge 910 - 17th Street, N. W.
=
Washington, D. C. 20006 GPU Service Corporation Richani W. Heward, Project Manager
'Ihomas M. Crimins, Jr., Safety and Licensing Manager 260 Cherry Hill Road Parsippany, New Jersey 07054 Government Publications Section State Library of Pennsylvania Box 1601 (TW rntion Building)
Harrisburg, Pensylvania 17126 1IO7 9I' 1JO/
VJl
' PPIC s P O
summaner
- OATE W Form. AEC 3IS (Rev. 9 53) AECM 0240 W u. s. oovanMusNT PRINTING OPPICEt le74.e20. tee
. rem,
TASK Tr\\RGET DATE FOR COMPLETION
- 10. Meted review of STS June 9, 1975 Sectiotis 3/4.7 through 3/4.10 11.
Questions to Commission June 16, 1975 on STS Sections 3/4.7 through 3/4.10 12.
Commission issues agenda June 23, 1975 for meeting on STS Sections 3/4.7 through 3/4.10 13.
Meted review of STS July 14, 1975 Sections 5.1 through 5.7 and 6.1 through 6.13 14.
Questions to Commission July 21, 1975 on STS Sections 5.1 through 5.7 and 6.1 through 6.13 15.
Commission issues agenda July 28, 1975 for necting on STS Sections 5.1 through 5.7 and 6.1 through 6.13 i58/
0ra32
ne.
E?:CI,0SURE /
SCPEDUI.E FOR REIDI 0F IM.u-STS T/ SR TARGrT D.',TI' FOR CO"PITIO" 1.
Meted revieu of STS February 17, 1975 Sections 1.0, 2.1 and 2.2 2.
Questions to Cennission*
Tebruary 24, 1975 on STS C2ctions 1.0, 2.1 and 2.2 3.
Cocaission issues agenda **
Harch 3, 1975 for nceting on STS Sections 1.0, 2.1 and 2.2 4.
Meted revicu of STS March 17, 1975 Sections 3/4.0 through 3/4.4 5.
Questions to Cor:aission March 24, 1975 on STS Sections 3/4.0 through 3/4.4 6.
Comission issues agenda March 31, 1975 for eceting on STS sections 3/4.0 through 3/4.4 7.
Meted review of STS May 12, 1975 Sections 3/4.5 thro.2gh 3/4.6 8.
Questions to Cornission May 19, 1975 on STS Sections 3/4.5 through 3/4.6 9.
Comission issues agenda May 26, 1975 for meeting on STS Sections 3/4.5 through 3/4.6 a.Q7 0 5 -),
c 1Ju'
~
- Within a week following review of the STS Sections, Meted should infor:a us of particular concerns or interests in the section under review
- Within one week of receipt of the questions from Meted, the Comission vill preparc and issue the agenda of a review necting to be held at a nutually convenient tine and location.
In addition to a ceuplete revicu of the STS sectica, we vill be prepared to ansuer Meted's specific cencerns.