DISTRIBUTI0ti:
December 16, 1977 Docket File OPA, Clare f1iles MRXEXRER NRC POR Dross L PDR Gray File ORBd4 Rdg 4 Extra Cys roc!:ct i'o. :
50-200 XXXMIIM TBAbernathy KRGoller/
JRBuchanan
~
TJCarter GX TUambach RIngram JWetmore GZwetzig WButler "ctropolitan Edison Cocpany Attorney, OELD XEMMX5H)t ATT1:
- 'r. J. G. Herbein 0.I&E (5)
VBenaroya P. O. Cox 5t.2 BJones.(4)
SHanauer Vice President EX BScharf (15)
Reading, Pennsylvania 19603..
JficGough BHarless DEisenhut Gentleren:
ACRS (16)
F.y letter dated i:ovember 30,1977,.the Comission issued Amendment i;o. 32 to Facility Operatina License No. DPR-50 for Three tiile Island !!uclear Station, Unit t!o.1 (TitI-1)..This amendment added interin Technical Specifications for fire protection based on the fire protection eauip-cent presently installed at TUI-1.
After issuing this amendment, it was detemined that W se portions of the anendment issued as Section 4.17 of the Technical Specifications should have been issued as Section 4.13.
It was also discovered that an error had been cado on pago 4-73a of the amended Technical Specifications.
Revised pages which correct these errors are transnitted herewith.
Sincerely, Robert W. Reid, Chief Operating Reactors Branch 51 Division of Operating Reactors
Enclosure:
Corrected Pages cc w/ enclosure: See next page Q,
s e.7
~400
\\ju
/
/
_h ORB #4:D08-ORB #4': DOR STS ORB #1 :00R C-0RB#4:00R Ringram / 'L.
._GZwetzig:rm JWe e
TFlar6ba6h
- % did---
o
..c-,~~...
OrncE
- SURNAME P
....12/p/77 12//5777
.~b 12/l/N 12/.../.r. /77 12/,1(/. 77.....
- oava, NRCFORM 318 (9 76) NRCM 0240
@ ua e. GOVERNMENT PRINTING OPPICEt 1970 = cas.ieu79110400// 8
Metropolitan Edison Company cc w/ enclosure (s):
G. F. Trowbridge, Esq.
Mr. Harry B. Reese, Jr., Chairman Shaw, Pittman, Potts, & Trowbridge Board of County Conynissioners 1800 M Street, N.W.
of Dauphin County Washington, D.C.
20036 Dauphin County Court House P. O. Box 1295 GPU Service Corporation Harrisburg, Pennsylvania 17120 Richard W. Heward, Project Manager Mr. T. Gary Broughton, Safety and Department of Environmental Resources Licensing Manager ATTN: Director, Office of 260 Cherry Hill Road Radiological Health Parisppany, New Jersey 07054 P. O. Box 2063 Pennsylvania Electric Company Mr. R. W. Conrad Chief, Energy Systems Vice President, Generation Analyses Branch (AW-459) 1001 Broad Street Office of Radiation Proa ams Johnstown, Pennsylvania 15907 U. S. En dronmental Protection Agency Room 645, East Tower Mr. Weldon B. Arehart, Chairman 401 M Street, S.W.
Board of Supervisors of Londonderry Washington, D.C.
20460 Township RFD #1, Geyers Church Road U. S. Environmental Protection Agency Middletown, Pennsylvania 17057 Region III Office ATTN:
EIS COORDINATOR Miss Mary V. Southard, Chairman Curtis Building (Sixth Floor)
Citizens for a Safe Environment 6th and Walnut Building P. O. Box 405 Philadelphia, Pennsylvania 19106 Harrisburg, Pennsylvania 17108 Government Publications Section State Library of Pennsylvania Governor's Office of State Planning Box 1601 (Education Building) and Development Harrisburg, Pennsylvania 17126 ATTN: Coordinator, Pennsylvania State Clearinghouse Dr. Edward 0. Swartz P. O. Box 1323 Board of Supervisors Harrisburg, Pennsylvania 17120 Londonderry Township R.F.D. #1 - Geyers Church Road Middletown, Penns.lvania 17057 e
e 1 s{ U,
s Li l sT
/^4
h.18 FIRE FROTEC""CN SYSSS k.18.1 FIRE FRvuun0N INSTRUME*tTS Avelicabilitf: Instr =ents listed in Table 3 18-1 Objective: To insure operability of fire detection instr =ents.
Specification _:
4.18.1.1 Each of the fire detection instr =ents listed in Table 318-1 shall be de= castrated operable:
- a., once each 6 months df a Channel Functional Test.
4.18.1.2 The non-supervised circuits between the local panels for the instruments in Table 3.13-1 and the control room shall be detonstrated OPERABLE at least once per =onth.
Amendment No.
32 4-72 b ~
,ea l
v,/
_U2
k.18'. 2 FIRE SUFFFISSICN WA""a SYSTE4 Apolicabilitv: Fire Suppression Water System as defined in Specificatics 1.8.
Objective: To insure system operability.
Specifications k.18. 2.1 Thp syste= shall be de=custrated operable:
a.
Once per 7 days by verifying 90,000 Ea11ces of water in the altitude tank, equivalent level in the circulating vater flune, and/or equivalent level is the river.
b.
Once per =enth en a staggered test basis by starting each m and operating it for 15 =inutes en recirculation fiev.
i 7
/07
)rrDu/
db3 Amendment No.
32 4-73
c.
At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the f'ow catn is in its enrrect position.
d.
At least once per12 months by performance of a system flush.
e.
At least once per 12 months by cycling each testable valve in
~
the fl.cw path through at least one complete cycle of full trave 1.
f..
At least once per 18 months by performing a system functional test which includes simulated autcmatic actuation of the sys en throughout its operating sequence, and:
1.
Verifying that each autcmatic valve in the ficw cath actuates to its correct positicn en a test signal,
_ 1 2.
Verifying that each pump develops at least 2S00 gpm at a system head of 260 feet for FS-P-1 and 294 feet for FS-P-2 and FS-P-3.
3.
Cycling each valve in the ficw path that is not testable during plant operatien tnrcugh at least one ccmplete cycle of full travel, and 4.
Verifying that each high pressure pumo starts -
~ ~ ~
~ ~ ~ ~ ~ ~ ~
to maintain the fire suppression water system preriure.
?.125. psi.
9 g.
At least once per 3 years by performing a flow tast of the system in accordance with Chacter 5, Secticn 11 of the Fire Protection Handbook,14th Editien, published by the Natier.a1 Fire Protection Asscciatien.
1r 7
e ^ /,
l ;y/
. V 'r Amendment No. 32 4-73a
i
- 4. 18.2.2 The fire pump diesel engines shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying; 1.
The fuel storage tanks contain at least 250 gallons of fuel, and 2.
The diesels start from ambient conditions and operate for at least 20' minutes.
b.
At least once per 92 days by verifying that a sample of diesel fuel from each fuel storage tank, obtained in accordance with ASTM-0270-65, is within the acceptable limits specified in Table 1 of ASTM-D975-74 with respect to viscosity, water content and sediment for the type of fuel specified for the diesels.
c.
At least once per 18 months, during shutdown, by:
1.
Subjecting each diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service, and 2.
Verifying each diesel starts from ambient conditions on the auto-start signal and operates for > 20 minutes while loaded
~ with the fire pump.
4.18.2.3 Each fire pump diesel starting 24-volt battery bank and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The electrolyte level of each battery is above the plates, and 2.
The overall battery voltage is > 24 volts.
Amendment No.'32 4-73b
,r-
}bu,/
JU3 e
.10.3 DEwCE/S?
"t SYSTE G Aonlicability:
Deluge and Sprinkler Syste=s.
Objective:
To insure system operability.
Seeeificatien:
k.18 3.1 The deluge and/or sprinkler syste=s listed in Specificatica 3 18.3.1 shall be de=onstrated to be operable:
a.
Once per =cuth by a flush through the drain / test valves at the inlet to each deluge valve.
b.
Once per =cuth by fleving vater through the inspectors test connection on each vet sprinkler header to veriff absence of header blockage.
c.
At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
d.
Once per 18 months by perforning a system functional test which includes tripping detectors and:
(a) verifying actuation of trip devices on associated deluge valves, and (b) cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.
This functional test will not normally involve flowing water through the sprinkler / deluge header. Deluge sprinkler valves will be inspected internally to verify operability in all instances where header flooding during the test is undesirable.
Once per 18 scnths by visual inspection of deluge headers to e.
vertt/ their integrit7 f.
Once per 18 senths by visual inspection (from ficor level) of each no::le to veriP/ absence of spray pattern bicekage.
g.
Once per 3 years by a gas or vater flev test of any open type deluge head to veriP/ absence of bicekage.
k.18.h CO2 SYSTE4 Atel '.eability:
CO System for the Cable Spreading Rocs.
2 Objective:
To insure systes cperability.
Steeifiestion:
h.18.h.1 The CO systes shall be de= castrated operable:
2 a.
At least once per week by verifying the CO2 storage tank level and pressure.
b.
At least once per 18 months by verifying the system valves and associated ventilation dampers actuate manually and automatically in response to a simulated actuation signal. A brief flow test shall be made to verify ficw from each no::le.
(" puff Test")
)
O V
Amendment No.
32 4-74
h.18. 5 Ealen Syste=s Apelicability: Ealen Syste=s described in S;ecification 3.18.5 Objective: To insure system operability.
Specificatien:
h.18.5 1 The Halen System shall be verified operable:
~
At least once per 6 months by verifying each Halo'n storage
~
~
a.
tank weight and pressure.
b.
At least once per 18 months by:
1.
Verifying that the syst<.m, including associated ventilatic=
dampers, actuates autc=atically to a si=:.tlated test signal.
2.
Functional test of the ultraviolet detectors, test of the pressure valve detecters, and replace:ent of the explesive actuators.
sQ7
(
r. 'l
~
u c.
O Amendment No.
32 h-75
h.lb.6 EOSI STATICOS Aeolicabilit?:
Ecse staticus listed in Table 3 18-2.
Obj ective:
To insure systes operability.
Specification:
k.18. 6.1 Each fire hose station shall te verified operable:
~
a! At least once per month by visual inspection of the station to assure all equipment is at the station.
b.
At least once per 18 months by removing the hose for inspection and re-racking, and replacing all gaskets in the couplings that are degraded.
At least once per 3 years, partially open hose station valves c.
to verify valve operability and no blockage.
d.
At least once par 3 years by conducting a hose hydrostatic test at a pressure at least 30 psi greater than the maximum pressure available at that hose station.
s' A=endment No.
32 4-76 3 r 7
^ "2
\\sGI JUU
-