Forwards Fr Notice of Grant of Relief from ASME Section XI, Inservice Insp Testing Requirements.Relief Granted on Interim Basis Pending Completion of Review Per 770817 & 0930 Ltrs Submitting Proposed Insp Description & Requests
ML19210A656
Person / Time
Site: Crane 
Issue date: 12/20/1977
From: Reid R
Office of Nuclear Reactor Regulation
To: Herbein J
METROPOLITAN EDISON CO.
References
NUDOCS 7910300686
Download: ML19210A656 (3)


Text

.

G a.

s;,

December 20, 1977

/

NRC PDR L POR Docket No.: 50-289 nRB#4 Readig RWPeid D

3P SVa RInaram GZWetZ1n lJ LJ_ J

d Juetmore WcN 7

GELO Metropolitan Edisor Coopany ATTH:

Mr. J. G. Farbein 0I&E(3)

DEisenhut Vice Presisent P. O. Box 542 TAbernathy JBuchanan Reading, Pennsylrania 19603 ACRS(16)

TCarter Gentlemen:

file RE: THREE MILE ISLAND UNIT NO. 1

\\

By letters dated August 17 and September 30, 1977, you submitted a croposed

\\

i inservice inspection and testing progran description and requests for relief from selected ASME Code requirements pursuant to 10 CFR 50.55a(n).

Although we have not completed our detailed review of your submittals, our preliminary review inakes clear to us that your proposed program to impleneat those ASME Code requirements that you have found to be practical would increase the scope of inservice inspection and testing for your facility beyond that currently required by your Technical Specifications.

We have concluded that this upgrading of your inservice inspection and testing program will further enhance safety.

Based on our preliminary review, we agree with your detemination that it is impractical within the limitations of design, geometry and materials of construction of components, for you to ceet certain of the specified ASME Code requirements and that imoosition of those requirecents would result in hardships or unusual difficulties without a compensating increase in the level of quality or safety. Therefore, pursuant to 10 CFR 50.55a(g)(6)(i), we hereby grant relief, on an interim basis, pending completion of our detailed review, from those inservice inspection and testing requirements of the ASME Code that you have requested. Moreover, since the scope of the inservice inspection and testing will be increased by your proposed program, and the granting of this relief is based only on the impracticality of selected ASME Code requirements, we have detemined that the relief granted neither increases the probability or consequences of accidents previously considered nor decreases safety margins and that, therefore, it does not involve a significant hazards consideration. Therefore, you are authorized to, and should proceed to, implement your proposed program (except where your current Technical Specitiutions are more restricti on January 2,1979, which is the date that *.he requirements of f

M'T f 10 CFR 50.55a(g) becoce effective for your facility.

1493 082 7910800 [gk

'g, 2-During the period between the date that the requirenents of 10 CF'l 50.55a(g) becone effective for your f acility and the date we coaalete our detailed review of your submittal you must coeply with both your existing Technical Specifications and your proposed inservice inspection and testing prograrr.

In the event conflicting requirements arise for sone components, you must comply with the more restrictive requirerents (e.g., shorter inspecticn intervals, increased nunoer of parameters measured).

In other words, the granting of this relief from ASME Code reouirements should not be interpreted to give you relief fron any of the requireinents in your existing Technical Specifications.

When our detailed review of your Aunust 17 and Septender 30, 1977 subnittals is complete we will:

(1) issue final approval of your program (which may contain modifications resulting from the staff's review), (2) grant relief fron any ASME Code requirements that are determined to be impractical for your facility for the duration of the inspection interval and (3) issue appropriate changes to your Technical Specifications.

A copy of the Federal Register Notice related to this action is enclosed.

6 Sincerely, Robert W. Reid, Chief Operating Redctors Branch i!4 i

Division of Operating Reactors

Enclosure:

Federal Register Notice

[) * *]h ; g]@( M ])!

A

~

'FU cc w/ enclosure:

a See next page 9

s b

d, f ORhM STSGy C.DRW4:p0R gj CLLD o,.ic.,

Il f

C1Lk

~ChcN#

GZwetzio:dn JWetmo)

~

12/20/77 p

12/f/77 12/(/

NRC FORM 313 (9 76) NRCM 0240 W u. s. oovanmusm, enwrme orries, seve = sas4:4 1493 083

Metropolitan Edison Company cc:

G. F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 GPU Service Corporation Richard W. Heward, Project Manager Mr. T. Gary Broughton, Safety and Licensing fianager 260 Cherry Hill Road Parsippany, New Jersey 07054 Pennsylvania Electric Company Mr. R. W. Conrad Vice President, Generation 1001 B oad Street Johnstown, Pennsylvania 15907 Miss Mary V. Southard, Chaiman Citizens for a Safe Enviror. ment P. O. Box 405 Harrisburg, Pennsyltania 17108 Government Publications Section State Library of Pennsylvania Box 1601 (Education Building)

Harrisburg, Pennsylvania 17126 1493 084

Ui ITED STATES *:UCLEAR req!'LATMY CG""ISSIO!!

00CKET t!0. 50-289 METRdPCLITA'i EDI50!! CC"?M:Y. JERSEY CE:: TRAL pr.E7 A!!D LIGHT C0" patly Ai!O PE;U.SYLVM;IA ELECTRIC C0!'PMiY fiOTICE OF GPA!!TI lG OF R:QEF FPrM _AS"E SECTInt! XI IflSERVICE I:ISPECTIC, (TEETI'M) 3EGUIRE"FitTS The U. S. tiucicar Regulatory Ccmmission (the Commission) has granted relief frca certain requirements of the AStiE Code,Section XI, " Rules for Inservice Inspection of fluclear Power Plant Comconents" to l'etropolitan Ediscn Ccmpany, Jersey Central Power and Light Ccmpany and Pennsylvania Electric Ccmpany. The relief relates to the inservice inspection (testing) program for the Three ' tile Island !!uclear Station Unit fio.1 (the facility) located in Dauphin County, Pennsylvania.

The AS"E Code requirements are incorporated by refererce into the Commission's rules cna regulations in 10 CFR Part 50. The relief is effective as of its date of issuance.

This action provides relief from certain AS.YE Code Section XI inservice inspection and testina requirements determined to be imprac-tical for the facility, because compliance would result in hardships and unusual difficulties without a compensating increase in the level of quality and safety.

The request for relief ccmplies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Ccmmission's rules and regulations.

The Ccmmission has made appropriate findings as required by the 5ct and the Ccmmission's rules and regulations in 10 CFR Chacter I, which are set forth in 1493 085 MV $$

711 C % z- 0 5-

/

.P

. the letter grantino relief.

Prior public notice of this action was not required since the grantina of this relief # rom AS"E Code recuire-ments does not involve a significant hazards consideration.

The Commission has detemined that the crantinq of this relief will not result in any significant envirorrental impact and that pursuant to 10 CFP.151.5(d)(4) an environmental impact statement or negative declaration and environrental imoact appraisal need not be prepared in connection with this action.

For further details with respect to nis action, see (1) the requests for relief datec August 17 and Senterber 30,1077, (2) the Commission's letter to the. licensee dated December 20, 1977 These iters are available for public inspection at the Commission's Public Docurent Rocm,1717 H Street, !!. M., Washincton, D. C. and at the State Library o' Pennsylvania, covernment Dublicatinns Section, Harri ' ura, Pennsylva.nia. A copy of item (2) may be obtained ta o qulatory Comission, upon recuest addressed to the U. S. Nuclear e

Washinnton, D. C.

20555, Attention: Director, Division of Operatino Reactors.

Dated at Bethesda, "aryland, this 20th day of December 1977.

FOP THE N1'CLESR REGt!LATCRY Cn"!SS!nN

/

g.m +,

./.i m-r Robert 'l.

Reid, Chief Operatinq Oeactors ? ranch -a Division of Coeratinn Deactors 1493 086