ML19210A458

From kanterella
Jump to navigation Jump to search
Requests Addl Financial Info Re Plant & Fabrication Const, First Core Assembly Inventories & Estimated Overall Const Expenditures Through 1971,showing Total Estimated Amount from Each Source of Funds
ML19210A458
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/31/1967
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Neidig R
METROPOLITAN EDISON CO.
References
NUDOCS 7910300480
Download: ML19210A458 (2)


Text

'

8 LU J M u]

g g "T I

q g

b g j OCT 31657 Eceket Nes. 50-3ez-end S W R~

nw

$.~c - 2 f)

Mr. R E. Neidig Vice President Metrepolitan Edisen Ccmpany P. O. Ecx Sh2 Beedir6, Pennsylvania 196'3

Dear Mr. Naidig:

In crder to centinue our review of your financial qualificaticns to censtrtet the prcpesed Three Mile Island Nucleer Staticn, we require the fclieving edditional informatien:

1.

In paragr ph 7 cn pager 4 cf the applicatica, Metrepelitan Ediscu estimates the cost of ccastruction cf the plant and fabrication cf the initial ecre te be $116,37,000. Please provide a break-devn of thee,e esti=ated costs in the follcving detail:

Imnd and land rights Structures and inprover.:ents Reacter plant equipment Turbegenerater units Accesscry electric equipment Misctellaneous pcver* plant equipment Tctal Direct i.sts Engineering, design, inspecticrs Startop Centit6encies, esen3etien Interest during ccustructicn Other indirects, including G&A, everhead, taxes, etc.

Total capital ecsts NCTE: Trensmissien plant, if any, is to te shewn se :arately frca plant prcper.

1487 068 791gggg Q

M D"*D

  • D'3' o h 1.

h, vw OCT 311967 Mr. R. E. Neidig

-2 2.

Inventcry ccats of the first core essemblies, including any spares, should net be included in capital ecsts under 1. above. These ccats should be reported senaretely. As the applicatien states that the T.lD4 in the first ecre vill be leased from tLe Cecmissien, its cest is not included in fuel inventory ccats. Hcvever, please show the quantity (in kilegrama), enrichment and dollar value of the uranium contained in the first core (including spares) as a separate item.

3 1he applicatica (paragraph 7) contains the estimated everall cen-ctructica expenditures fcr the years 1967.lC69 As the ecnatruc-tien peried fcr the station may extend thrcugh 1971, please pre-vide the estimate threugh 1971 showing the total estimated amcunt that each source of funds (e.g., funds generated internally and equity and debt securities) is presently expected to previde each year.

The above information should be submitted as an amendment to your applicatica with three copies signed under ceth er affirmaticn and tventy-seven additional ecpies.

Sincerely ycurs, Original sped W Peter A. Morris Peter A. Merris, Directer Divisica of Reacter Ticensing cc:

Mr. George F. Trewbridge, Esq.

Distribution:

AEC Decument Room Formal Supplo f,f,f DRL Re'ading RPEf3 Reading

](Q[,Qgg Orig:

L'Karas R. S Ecyd H K Shapar, OGC L Kornblith, C0 T. F Ehgelhardt, CGC N Eube, ERL J

R. Euchanen, ORNL C.

n L. cm, ^^

omer > -gpgg3 rp3.

--pp3y3 pan-_. -_... OGC --- -

- -PP DEL--

--DRL.44 --

/

2

/

.Ahras'<lty LP7. '.

sunNaut>

--CGLeng

- RSEcyd--

--PAMerris DATE >_

10-30-67-. -- - 101----.167_ =.10 L 167==10L

.!67.. M2 13 b67--

Ebrm A EC-3tR ( Rev. 9-A3) u s cogitswssipnarisc orrict.:w6-o-2ia 4cs