Nonroutine 10-Day Rept 75-10 Re Unplanned Release of Radioactive Matl on 751206.Addition of Water to Coolant Sys Bleed Tank a Resulted in Overpressure & Radioactive Release. Makeup Tank Insp Underway to Identify Any Leaks
ML19210A159
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/16/1975
From: Arnold R
METROPOLITAN EDISON CO.
To:
References
GQL-0012, GQL-12, NUDOCS 7910240884
Download: ML19210A159 (4)


Text

NRC S_TRIBUTION FOR PART 50 DOC M ATE RI AL

' ~ *

(TEMPORARY FORM)

1 CONTROL NO
19 FILE: INCIDE = RrronT r FROM: Metropolitan Edison Co. DATE OF DOC DATE REC'D LTR TWX RPT OTHER

, Reading, Pa. 19603 .

R.C. Armld - -- l'-16-75 12-19-75 XX ORIG CC OTHER SC.NT AEC PDR X:'

TO:

NRC 1 sig'ned SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'O DOCKET NO:

X'Ci 1 50-239 DESCRIPTION: Ltr trans the following:

ENCLOSURES: Nonroutine 10-Day Report 75-10

" Report of an unplanned release of radicact material occurring 12-6-75.....

g t (1 cy enc 1 rec'd)'

g g m m, **-s ~ e,,, . O '~ :r. n o. ;

PLANT NAME: Three Mile Island Unit 1 .

FOR ACTION /INFORMATION DHL 12-23-75 BUTLER (L) SCHWENCER (L) ZlEMANN (L) REG AN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Cocies W/ Copies W/ Cocies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies W/ Copics W/ Copics KNIEL (L) PURPLE (L) YOUNGBLOOD (E) adEID W/ Copics M' Copies W/ Copics W @ cpics INTERNAL DISTRIEUTION TECH REVIEW DENTON LIC ASST A/T IND <

AGNiv.,FU r v H a SCH ROE D E R R. DIGGS (L) BRAINAN f  % RIMES SALTZMAN OGC, ROOM P 506A A1ACCARY GAMMILL H. GEARIN (L)

GOSSICK/STAF F KNIGHT KASTN E R E. GOULROURNE (L) MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E) f PLANS SHAO SPANGLER J. LEE (L)

COYD **s STE LLO M. RUShEROCK (L) MCCONALD MOORE (L) ENVIRO -

S. REED (E) CHAPMAN

    • fHOUSTON DUBE (Ltr)

DEYOUNG (L) ** fNOVAK MULLER M. SERVICE (L)

DICKER S. SHEPPARD (L) E. COUPE SKOVHOLT (L) f ROSS lPPOLITO KNIGHTON M. SLATER (E) PETERSON GOLLER (I.) (Ltr) f HARTFIELD (2)

P. CO LLINS /TEDESCO YOUNG BLOOD H. SMITH (L)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E) EISENHUT V. WILSON (L) *WIGGINTON

/*Fil E &TEGION (2) BENAROYA p.!MC/PE' (3) VOLLMER HAR LESS 8. INGRAM (L) s F. WILLIAMS STEELE H. DUNCAN M) eHAWU" EXTERNAL DISTRIBUTION _

pl - LOCAL PDR Harrisburg, Pa.

p1 -TIC (ABERNATHY) (1)(2)(10) - NATIONAL LABS 1 - PDR SAN /LA/NY 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAE f l - NSIC (BUCHANAN) 1 - G. ULRIKSON. O RN L 1 - ASLB 1 - CONSULTANTS 1 - Newton Anderson NEWM ARK /B LUM E/AG B ABI AN 1 - AGMED (RUTH GUSSME ACRS 5E:E TO LIO ASST R. Ingram 12-23-75 Rm B 127 GT hl6** SEND ONLY TEN DAY REFORTS '

1 - J. D. R UN K LE'S, R m E 2'

  • 1 GT

, 1490095'.>foimo g _o

~

. /

tygg .

2 -~~a kegulatog Docket "lg-w._ %U

, METROPOLITAN EDISON COMPANY m " = m = = m c r =: m POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPp4M-3601 f\ ; &$' l\

December 15, 1975 Ac / ,}\ti N.3

'y

, y\

GQL 0012 ,JI d l b d k

Ici-

.9 97b "M

,eca 'i Director of Nuclear Reacter Regulation a u.s. C,/

U.S. Nuclear Regulatcry Co==ission .gf

\ -;^j/

Washington, D.C. 20555 fN gr o<;,,. [f -

Dear Sir:

W Docket No. 50-289 Operating License DPR-50 Nonroutine 10-Day Report 75-10 In accordance with Section 6.7.2.a.2 of the Technical Specifications for our Three Mile Island Nuclear Station Unit 1, enclosed please find Nonrcu-tine 10-Day Report 75-10 that deals with an unplanned release of radicactiv.'

caterial which occurred on December o,1975.

We vould like to point out that no member of the public and no station or contractor personnel received a radiation dose in excess of the limits stated in 10 CFR 20 as a result of the release. Further, none of the limits given in the Technical Specifications were exceeded.

We trust that this satisfies the reporting requirements referenced above and adequately ansvers any concerns you may have.

Sincerely,

/

r

  • R. C. : old g ty Vice President e, .

RCA:JMC:eg

Enclosure:

Nonroutine 10-Day Report 75-10 It g 029f p% 71f

\hi s

cc: Mr. J. P. O'Reilly - U.S. NRC-Region 1 Ms. Margaret Reilly - Pa. DER D.g g 51:// I' g

File 20.1.1/7.7.3.12.1 *

  • 1490 096 14078

@ e m, -- r '

NOURCUTDZ 10-DAY REPORT 75-10 REPCRT OF AN U'iPlA:CIED RELEASE OF RADICACTIVE MATERIAL CCCURRDG ON DECE:EER 6,1975 ,

f Descrittien of Occurrence:

On December 6,19'is, between the hotrs cf 10h5 and 1245 (two hours),

an inadvertant release of radioactive material occurred while water was being added to the Reactor Coclant System from Bleed Tank "A". This addition of water to the Makeup Tank resulted in an increase of pressure in that tank which caused the release of radioactive material thrcugh either the Makeup Tank manvay gasket or frcm a valve (MU-V13) isolating the Makeup Tank from the Vent Reader.

Arrarent Cause of the Occurrence:

No apparent cause has been definitely identified at this time.

Sampling in the area of the Makeup Tank and MU-V13 during makeup to the Reactor Coolant System is continuing in an attempt to identify any leaks.

Analysis of the Occurrence:

For the following reasons it is believed that the unplanned release of radioactive material en the 6th of December did not endanger either the health or safety of the public,

a. None of the limits in the TMI-l Technical Specifications were exceeded.
b. None of the maximum permissible concentration limits _'or non-radiation vorkers as given in 10 CFR 20 were exceeded at the site bounde.ry,
c. No individual on site at the time of the release received a radiation dose in excess of the limits for radiaticn verkers specified in 10 CFR 20.

Corrective Action:

The release was identified subsequent to the makeup evolution. The imediate corrective action was to sample the Makeup Tank rocs to verify the source of leakage.

A program has been initiated to identify problematic areas in our Vent Header System and cor-ect any deficiencies. As part of this program, a special operating procedure was written to require sa=pling of the Makeup Tank roca and the i=edint area adjacent to MU-713 during a makeup to the Reactor Coolant System in an atte=pt to isolate the source of leakage.

1490 097

9 e Nonroutine 10-Day 2 Report 75-13 Jailure p<ta:

NOT ILE:iTIFIED Release Data:

NOTE: In no case did any member of the public cr any station er con-tractor personnel receive a radiation dose near the applicable limits given in 10 CFR 20.

The total release consisted of .262 curies of predeminantly Xe-133 (assumed to be 100%) based on Radiation Monitoring System Strip Chart Recordings. The maximum instantaneous noble gas release rate during the two (2) hour period was 2.68 x 102 M3/see which is below the Technical Specification limit of 1.2 x 105 M 3 /sec. The average release rate during the period was 1.21 x 102 M3 /sec. There vere no personnel exposures involved in this release since there ve e no cperational or maintenance functions evolving in the Reactor Ccolan , Makeup Tank Rocs er the area adjacent to MU-V13 during the time of the . elease. Sa=ples taken in the Makeup Tank Room shortly after the release oce';.rred shoved no ga=ma emitters present.

1490 098