Forwards Addl Responses to 780120 Standby Diesel Steam Generator Questionnaire.No Info Available for Questions Still Unanswered
ML19210A106
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/14/1978
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-0381, GQL-381, NUDOCS 7910240825
Download: ML19210A106 (6)


Text

-

21 m REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIEUTION FOR INCOMING NATERIAL 50-289 FEC: REID R W ORG: HEREEIN J G DOCDATE: 07'id/75 NRC METROPOL EDISON DATE RCVD: 07/10/7::

DOC TYPE: LETTER NOTARI ZED: NO COPIES RECEI'JED SUEJECT:

'LTR 1 ENCL 1 COMMENTS ON THE COMPLETED STANDBY DIESEL GENEPATOR QUESTIONNAIRE STATING THAT CUE:TICNS ANSWERED UNKNOWN STILL HAVE NO ANSWERS AND THEY DO NOT INTEND TO RESPOND FURTHER TO QUESTIONNAIRE.

FLANT NAME: THPEE MILE ISLAND - UNIT 1 REVIEWER INITIAL:

XRS DISTRIEUTOR INITIAL.

44 4 4 4 444 4 4-t 44 4 4-&4 DISTRIEUTION OF THIS MATERIAL I:L AS FOLLOWS 4 + 4 4 4 4 * + 4 4 4 4 4 4 4 + * -*

RELIABILITY OF STANDBY DIESEL GENERATOR UNITE.

(DISTRIDUTION CODE A014)

FOR ACTION:

BR CHIEF ORE 44 EC*45W/3 ENCL INTERNAL:

(n 3 FILE *+;

L NRC POR**W/ ENCL wr_ < -< w.: ENCL OELD**W/ ENCL H AN AUER 45+-W/ ENCL POWER SYS BRis*W/ ENCL F CLEMEP' SON *-tW/ ENCL DIS SER ER-MC**W/ ENCL EXTERNAL:

LPDR'S HARRISEURG, P A*<-W/ ENCL TERA *-+W/ ENCL NSIC**W/ ENCL ACRS CAT B*4W/10 ENCL

-(

1489 141 DISTRIEUTIOR LTR 25 ENCL 25 CONTROL NBR:

782d'20-?O:?

SIZE: 1P>4P

-F 4444 444444 44-6-t 4444-+4 4-F44 44 44 4-4-t 4 4 4 THE END

~+ -+-+ 4 4 *

  • 4 4 *
  • 4 4 4 4-+ 4 4 4 4 -5 + 4 4 + 4 4 + + + + + + '

[,, i 7910240hA6

/

w

,/

fMD i

~re a noann J

[

/ METROPOLITAN EDISON COMPANY..mco av cc "o.u er. euc urrure: co mm -

POST OFFICE 80X 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-0601 July lb, 1978 GQL 0381 Director of Nuclear Reactor Regulation Attn:

R. '4.

Reid, Chief Operating Reactors Branch No. h U. S. Nuclear Regulatory Cc=nission

'4as hington, D. C. 20555

Dear Sir:

Three Mile Island Nuclear Station Unit 1 Operating License No. DPR-1 Docket No. 50-289 Enclosed with Met-Ed letter of January 20, 1978 (CQL 0078),was cur cc=pleted Standby Diesel Generator Questionnaire. At that time, we vere unsble to answer all of the questions. Answers have since been determined for sc=e of the questions originally answered "unkncvn".

Met-Ed has been unable to determine ansvers for the re=aining questions and therefore does not intend to respond further to the questionnaire.

Sincerely,

%/

/

, /,J. G. Herbein Vice President-Generation JGH:DGM:cjg Enclosure 1489 142 t h,

,m.m.,

Enclosure July 14, 1978 GO.L 0381 ~

2.

If air cranking, then:

i I j, S

Give size of starting air tank: Length 103" _ Diameter 30" g

e.

}1ormal standby air tank pressure _ 250 psi.

s Is pressure reducer used? Yes Ho X

L --

Reducer pipe size?

N/A inches.

Starting air control admissien valve pipe size in air piping system, 14 inches.

11tnimum air tank pressure for engine cranking 75 psi.

Humber of five-second cranking periods between above 6

pressures with no tank recharging Est.

ilumber of air tanks per engine 2

Can starting air tanks serve more than one engine?

Yes No X

Is air pipe to engine frcn top of air tank? Yes X

Ho Does starting air tank have water condensate drain?

Yes X

No Does starting air pipe have water condensate trap and drain near engine? Yes No X

!s starting air piping horizontal? Yes No Both X

Does it slant toward drain? Yes Ho X If water condensate drains are provided, then is draining:

Autcratic through float valve? Yes No X

a.

b.

Manual by hand valve? Yes X No If nanual, then is draining water condensate done:

c.

(_

148')

143

Diameter of starting air pipe frca:

a.

Air tank to starting valve 25 inches b.

At air starting valve Ib inches c.

At engine Ib inches What is the primary source of power for the starting air

._u system?

Elec. Air Concressor Is there a duplicate and redundant rotor and air compressor set? Yes flo X What is the time required to recharge one air tank? -

Est.

30 minutes

~

Does starting air supply system have independent secondary power supply for compressor? Yes X Ho If yes, then by:

a.

Gasoline engine?

fo b.

tiotor driven?

To Other? (SpecifyT 3:IAIT Diesel Engine c.

This Section3.

If electric (Battery powered) cranking, then:

is :i/A a.

Battery charging: Continuous trickle charger Intermittent charging If so, how is charging requirement determined?

-Tine cycle Test Other r-b.

Battery used: Common plant Individual Unit i

Other Starting cable size

Length
Battery to engine (longest) 1489 144

q

_g.

6.

Mater temperature Sensor Position:

t.:

l a.

In piping frca engine Yes 3

b.

In erigine piping No p'.{

c.

In engine direct no 3

7.

Water surge or supply tank in system.

Yes X fio If yes, then bott:m connected to:

a.

Water pump suction? Yes X

No b.

Top of systen? Yes X

tio c.

Both of above? Yes x

No d.

Is bottom of surge tank above tcp of engine system? Yes X flo e.

Does engine have constant air bleed from top of engine water piping to surge o.r supply tank?

Yes X Ho Approx.

f.

Give size of oleed or vent line, i

inches.

~.

g.

flanual air bleed only? Yes x

i;o F.

Governor - Soeed Cont-ol flanuf ac turer

%n +ma Electric (speed sensing)

No Hydraulic Yes Type or code ( such as EGO-35, LSG-10, etc. )

vo8 Aut0matic load sharing? Yes X Ho 1.

Is compensation or stability control and/or speed of response manually adjustable? Yes X

No If yes, ad,iusted by:

a.

Eye and ear? No b.

Test and specification? Yes I~

c.

Other? (Speci fy)

No i

2.

Engine - generator normal shutdewn or stopping nteas j

and nethod.

Electrically Trip cut Fuel Racks and Manually 1489 145

. z Give usual time intervals as follows:

)

2.

a.

Time from start-to-crank to first firing of any Cylinder.

Less than h Seconds.

b.

Time frca start-to-crank to approximate full firing

_ -5 seconds h

of all cylinders.

3.

Give maximun speed surge when starting; use both tachemeter and frequency reter if possible.

a.

Usual conditions 910 Est. rpn 60.1 Est.Hz b.

flaximum observed 020 Est.rpn

~

60.2 Est.Hz 4.

During a surveillance test, give-time froa start-to-crank to when steady synchronous speed is attained and maintained.

a.

Usual

<10 seconds b.

Maximun (10 seconds c.

As specifiec i-10 seconds.

5.

Give briefly the rest troublesome problems in starting.

Lube Oil 'tess Switches a.

Most troublesome NCES b.

f.' ext to most troublesome P.

Air Cleaner or Air Filter - Combustion Air 1.

Combustion air source:

taken frca engine roca or inside l

the building, or frcm outdoors?

a.

Indoors Yes b.

Ou tdoors no 1\\

if-1489 146