ML19210A077

From kanterella
Jump to navigation Jump to search
Forwards Notice of Issuance of Amend 26 to OL DPR-50
ML19210A077
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/22/1977
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
OFFICE OF THE FEDERAL REGISTER
References
NUDOCS 7910240168
Download: ML19210A077 (1)


Text

/'

'o

- NUCLEAR REGULATORY COMMIFCION

[ "

h ( ~,j WASHINGTON, D. C. 20555 c

r jie-mu a% Ov4[

r OFFICE OF THE March 22, 1977 SECRETARY Director Office of the Federal Register National Archives and Records Service Washington, D. C.

20408

Dear Sir:

Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:

METROPOLI*AN EDISON COMPANY, ET AL.

Docket No. 50-289 NOTICE OF ISSUANCE OF AMEIDME;T TO' FACILITY OPERATING LICENSE Publication of the above document at the earliest possible date would be appreciated.

Sincerely,

. Samuel J. Chilk Secretary of the Con::ission

Enclosures:

Original and 2 certified copies bec: dtecordsFacilityBranch Public Affairs ~

Executive Legal Director g,g.f Office of Congressional Affairs Office of the General Counsel SECT - C&R Branch 1498 254 l

7910240/((

c

p s-

' UNITED STATES NUCLEAR REGULATORY COM"lSSION DOCKET NO. 50-289 METROPCLITAN EDis0N COMPANY JERSEY CENTRAL POWER AND LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE Tne U. S. Nuclear Regulatory Comission (the Commission) has issued Amendment No. 26 to Facility Operating License No. DPR-50, issued to Metropolitan Edison Company, Jersey Central Power and Light Company and Pennsylvania Electric Company (the licensees),

which revised Technical Specifications for operation of the Tnree Mile Island Nuclear Station, Unit No. 1 (the facility) located in Dauphin County, Pennsylvania. The amendment is effective as of its date of issuance.

This amendment changes the provisions of the Technical Specifications to extend the period of applicability of the present limits on the reactor coolant system pressure and system heatup and cooldown rates from 1.84 effective full power years (EFPY) to 2 EFPY.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chaptee I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

19 WE O G S

n.. :.= =.,!, - x 146$

255

~

The Comission has determined that the issuance of this amendment will not result in any significant environmental smpact and that pursuant to 10 CFR 651.5(d)(4) an environmental. impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuan'e of c

this amendment.

For further details with respect to this action, see (1) the application for amendment dated March 7,1977, (2) Amendment No. 26 to License No. DPR-50, and (3) the Comission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C. and at the Government Publications Section, State Library of Pennsylvania, Box 1601 (Education Building),

Harrisburg, Pennsylvania.

A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission. Washington, D. C.

20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 16th day of March 1977.

FOR THE NUCLEAR REGULATORY COMMISSION

(

k'k.'

s Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors 148%

256