ML19209D187

From kanterella
Jump to navigation Jump to search
Forwards Lers 79-122/03L-0 & 79-121/03L-0
Date released: 08/11/2019 Download: ML19209D187


LER 79-121/03L-0:on 790918,containment Sump Flow Integrator FTO-DA115 Stopped Totalizing Flow & Was Declared Inoperable. Caused by Piece of Rubber Glove in Internals,Preventing Rotor from Turning.Matl Removed & Totalizer Returned to Svc
ML19209D193
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/18/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209D193 (2)
LER 79-122/03L-0:on 791019,steam Generator C Support Temp Went Below Tech Spec Limit of 225 F.Caused by Operating Personnel Failing to Reconize Low Support Temp Until Lower Limit Was Exceeded.Heaters Energized to Increase Temp
ML19209D190
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/18/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209D190 (2)
Forwards Lers 79-122/03L-0 & 79-121/03L-0
ML19209D186
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/17/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209D186 (1)