o
UNITED STATES
[O d'0
8
NUCLEAR REGULATORY COMMISSION
gg,e/
o
g
.m
REGION 11
o
101 MARIETTA ST., N.W.. SUITE 310o
ATLANTA,CEORGIA 3o3o3
.....
In Reply Refer To:
AUG 311979
RII:BRC
50-348/79-27
50-364/79-12
.
Alabama Power Company
Attn:
F. L. C.ayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, Alabama 35291
Gentlemen:
This reftrs to the inspection conducted by B. R. Crowley of this office
on August 13-15, 1979 of activities authorized by NRC License Nos.
NPF-2 and CPPR-86 for the Joseph M. Farley Plant facility, and to the
disc ssion of our findings held with W. G. Hairston at the conclusion of
the inspection.
Areas examired during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas', the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have exarined actions yu have taken with regard to previously identi-
fied enforcement matters. These are discussed in the enclosed inspection
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractot) believe to be proprietary, it is necessary tha* you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear froa you in this
regard within the specified period, the report will be placed in the
Public De;ument Room.
117/ R6
g oiso N
__
.
AUG 311973
Alabama Power Company
-2-
.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
.
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inrpection Report Nos. 50-348/79-27
and 50-364/79-12
cc w/ enclosures:
A. R. Barton
Executive Vice President
Post Office Box 2641
Birmingham, Alabama 35291
J. T. Young
Vice President-Production
Post Office Box 2641
Birmingham, Alabama 35291
H. O. Thrash
Manager-Nuclear Generation
Post Office Eox 2641
Birmingham, Alabama 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
Post Office Box 2641
Birmingham, Alabama 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, Alabama 36312
R. E. Hollands, Jr.
QA Supervisor
Post Office Box U
Ashford, Alabama 36312
1177