Forwards QA Program Insp Rept 99900329/79-01 on 790604-06 & Notice of Deviation
ML19209C744
Person / Time
Issue date: 07/24/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Duvall D
GOULD-BROWN BOVERI
Shared Package
ML19209C732 List:
References
REF-QA-99900329 NUDOCS 7910180240
Download: ML19209C744 (2)


Text

    • * * %g hkN UNITED STATES 4

,,og y ;

'.2.,

g NUCLEAR REGULATORY COMMISSION p

REGION IV

, {

S*

c 611 nYAN PLAZA DRIVE, SUITE 1000 4.,

d D

,o ARLINGTON, TEX AS 76012 2 4 JUL 1979 ~

Docket No. 99900329/79-01 C mid-Brown Boveri Switchgear Operations Attn:

Mr. D. D. Duvall Director, Switchgear Systems Operations Norristown Road

.Springhouse, Pennsylvania 19477 Genticmen:

'This refers to the QA program inspection cc.tducted by Mr. J. R. Agee of this office on June 4-6, 1979, of your facility at Tulsa, Oklahoma, associated with the manufacture of switchgear prcducts and to the discussions of our findings with Messrs. U. A. Donaldson and E. U. Rhoads and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA program is being effectively. implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers,,is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others. You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking ef fective corrective action in response to their findings.

Areas exanined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an excmination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed, lill 284 9

4 0 19101@ t

Could-Brown Boveri Switchgear Operations In accordance with Section 2.790 of the Commission's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Co= mission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include

'a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor -

mation identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased..

to discuss.them with you.

Sincerely, k,

5 Uldis Potapovs, Chief Vendor Inspection Branch

-r

~

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900329/79-01 11//

185

+

p 3

  1. .Y