ML19209C731

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in QA Program Insp Rept 99900329/79-01
ML19209C731
Person / Time
Issue date: 08/30/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Duvall D
GOULD-BROWN BOVERI
Shared Package
ML19209C732 List:
References
REF-QA-99900329 NUDOCS 7910180228
Download: ML19209C731 (1)


Text

o An arc,,

g e

'o UNITED STATES

/

'g

[Y*

g NUCLEAR REGULATORY COMMISSION a-c c REGION IV C

8 611 RYAN PLAZA DRIVE, SUITE 1000

  • g ARLINGTON, TEX AS 76012 w.

August 30, 1979 Gould-Brown Boveri Switchgear Systecs Operation Attn:

Mr. D. D. Duvall Director, Switchgear Systems Operations Norristown Road Spring House, PA 19477 Docket No. 99900329/79-01 Gentlenen:

Thank you for your letter of August 12, 1979, in response to our letter dated July 24, 1979, with an enclosure. We have no further questions at this time. We will review your corrective action during a future inspection.

Sincerely, t

\\

h$otapbys, Chier [Ad u

Uldis Vendor Inspection Branch

!!77 281 d

7910180 1

-