Text
- "
UNITED STATES
4
.
, _q
- g
NUCLEAR REGULATORY COMMISSION
j
.j
REGION I _
{
631 PARK AVENUE
e
,
c
KING OF PRUSSI A, PENNSYLVANI A 19406
.....
Docket No. 50-289
Metropolitan Edison Company
ATIN: Mr. J. G. Herbein
Vice President
P. 0. Box 542
Reading, Pennsylvania 19603
Gentlemen:
G
Subject:
Inspection 50-289/7
-
This refers to the inspection conducted by Mr. Donaldson of this office
on June 7-10,1977 at the Three Mile Island 1 Nuclear Facility of activ-
ities authorized by NRC License No. DPR-50 and to the discussions of our
findings held by Mr. Donaldson with Mr. G. Miller and other members of
your staff at the conclusion of the inspection, and to subsequent
telephone discussions between Messrs. Stohr, Donaldson and Kellogg of
p,
this office and Messrs. Miller and Dubiel of your organization on June
'
23, 1977 and between Mr. Donaldson and Mr. Dubiel on ~ June 28, 1977.
Areas examined during this inspection are described in the Office of
Inspection and. Enforcement Inspection Report which is enclosed with this
letter.
Within these areau, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
These items of noncompliance have been categorized into the levels
as described in our correspondence to you dated December 31, 1974. This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full com-
pliance will be achieved.
.1Acn
, e-
, -
/6 Tst
.) J 4
1476 063
g
.__
_.
7910170
'
,
.
.
-
.
/
'
,
-
Metr,opolitan Edison Company
2
.
Another activity appears to be a deviation from accepted health and
safety practices, i.e., smoking while handling contaminated materials.
Please include in your response your coments concerning this activity
which is discussed in the enclosed Inspection Report as a Deviation.
Item A, shown in the Notice of Violation enclosed with this letter, is a
recurrent or uncorrected item.
In your response please give this matter
your particular attention.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must be accompanied by an affidavit
executed by the owner of the information, which identifies the document
or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by
the Commission as listed in suboaragraph (b)(4) of Section 2.790.
The
information sought to be withhe.d shall be incorporated as far as possible
!
C
into a separate part of the affidavit.
If we do not hear from you in
!
this regard within the specified period, the report will be placed in
!
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
sdh
"
Paul R. Nelson, Chief
Fuel Facility and Materials Safety
Branch
AACA
icr_
s rJ4
auJ
-
\\
r
1A76 064
. ..
.
.
O
'
Medropolitan Edison Company
~
3
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection ano Enforcement Inspection
Report Number 50-289/77-18
cc w/ enc 1:
4
L. L. Lawyer, Manager, Generation Operations - Nuclear
G. P. Miller, Superintendent
R. W. Heward, Project Manager, GPUSC
Miss Mary V. Southard, Chairman, Citizens for a Safe Environment
(Without Report)
.
!
J^)
-
,
t
7
A 43%
1476 0e5
.
%
m,Y
.,
. . .
+