ML19209C636
| ML19209C636 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/23/1974 |
| From: | Vollmer R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Lear G US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7910160732 | |
| Download: ML19209C636 (1) | |
Text
DISTRIBUTON Docket Files QA Reading L Reading 3g:
RHVollmer Cocket No. 50-239 RMcDermott DSkovholt George Lear, Chief, Operating Reactors Branch i3, L METROPOLITAN EDISON CCfiPANY - TFREE MILE ISLAND 1 Our review of R0 Inspection Report No. 50-239/74-29 indicates that the licensee has decided to eliminate the turbine trip test from 100% power, from his power escalation test program. The inspection report (paragraph
- 5) states that the licensee eliminated this test by performing a safety review in accordance with paragraph 50.59 of 10 CFR 50.
We do not egree that the provisions of 50.59 pennit licensees to eliminate tests from their initial test program. Any planned reductions to DL approved test programs should be submitted for appropriate DL review and approval.
f*y siens hv:
Richard H. Vollmer, Chief Quality Assurance Branch Directorate of Licensing g.
7910160 p j
L UAL a
>c =
- RMcDe,t:dp Jmer y{[
..~...
9/20/74
_. 9['/ 74 _
Form AEC 318 (Rn. 9-53) AECM 0240 2 u. e. sovsamassar rmarine orrican s ota.sae-s ee