AUG g9 Docket Hos. 50-448 50-449 Potomac Electric Power Company ATTN:
J. J. Scoville Vice President Nuclear Engineering & Environmental Affairs 1900 Pennsylvania Avenue, NW Washington, DC 20006 Gentlemen:
This letter is to confirm the dates of August 15 and 16,1979 for a visit by.
the NRC environmental review staff to the Douglas Point site and the alternative sites. This visit was previously diccussed.?ith your staff by telephone.
The visiting team will consist of the NRC Envirenmental Project Manager (EPM) and four members of the technical review team from Oak Ridge National Laboratory.
As previously discussed by telephone with Jim Potts, we expect to meet at the Martha Washington Hotel in Waldorf at 8:00 AM on Wednesday, August 15, 1979.
The team will soend that day visiting alternative sites. The following day we will continut. ur alternative site inspection, ending with the Douglas Point site. We will then meet to discuss our information needs.
Please feel free to telephone Ms. Suzanne Kebiusek EPM, who will lead the visiting team at 492-8440 if additional information is required relating to the site visit.
Sincerely, LL
- 1I.Se1s,ActingBranchChief nvironmental Projects Branch 2 Division of Site Safety and Environmental Analysis 1145 279 7910150 8 S O k