DUKE POWER COMPANY Powra BUU.DINO 422 SocTu Curacu Sinzzi, Cuant.orTz, N. C. 28242 W I L LI A M Q. PA R M ER, J R.
v. e pec..c c.ev October 8, 1979 c ce-e~c:
- e 7:4 Stt as Pecouc*io e 373-4083 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:
Mr. Robert L. Baer, Chief Light Water Reactors Branch No. 2 Re: McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Your letter of September 26, 1979, transmitted a copy of your review schedule for the remaining open items in the McGuire Operating License review and requested verification or correction of the response dates for the applicant action items. Attached ir a listing of each of these items, as identified in your letter, with a description of the information to be submitted and the date by which this information will be sent.
If there are questions concerning any of these items, please do not hesitate to contact my staf V ry truly yours
... ~
d).
William O. Parker, Jr.
GAC/sch Attachment gPROGep,*+
1144
'M4 g
y/ -
\\
~
r.
3
=
Ah
\\ g gy l Anniversary 79393 gg F} J
%,DWER /
M
McGuire Nuclear Station Outstanding Review Items 2.
ATWS Response to this item was transmitted by W. O. Parker letter of September 25, 1979.
4.
SIS Bypass Response to this item wus transmitted by W. O. Parker letter of Aug us t 31, 1979.
(Attachment 7) 7.
RSB 5-1 A descripcion of the method by which the design of McGuire complies with this Branch Technical Position will be provided by November 5, 1979.
- 11. Guide Tube Wear A meeting with representatives of Westinghouse and the NRC staf f is scheduled for October 12, 1979, in which Westinghouse will discuss this matter generically. Any plant specifics identified in that meeting would be provided by November 12, 1979,
- 13. Load Follow Strategy, Analysis A meeting is being arranged between representatives of Eastinghouse and NRC Core Performance Branch to discuss this item. A tentative date for this meeting is October 30, 1979. Any additional documentation required as a result of this meeting would be included in the next revision to the McGuire Final Safety Analysis Report. (Revision 39 -
November 20, 1979)
- 24. Radiological Effluent Technical Specification (RETS)
The RETS were submitted by W. O. Parker letter of July 25, 1979. A revised Of fsite Dose Calculation Manual (0DCM) along with several minor thanges to the RETS will be submitted by October 31, 1979.
- 28. FW Pipe Cracks, 79-13 Our initial response to IE Bulletin 79-13 was submitted to NRC - Region II on September 19, 1979. However, since that time we have revised our planned inspection scope. A revised response will be submitted by October 17, 1979. A copy of this response will be provided to the Office of Nuclear Reactor Regulation at that time.
e c
114 4
,3 a "a
- 31. RWST Capacity Response to this item was transmitted by W. O. Parker's letter of September 25, 1979.
- 32. Secondary Water Chemistry A lescription of the McGuire Secondary Water Chemistry program will be provided by October 26, 1979 as requested by Mr. Robert L. Baer's letter of August 24, 1979.
- 34. Containment overpressurization (MSLB)
An initial response to this item will be provided by October 22, 1979 as requested by Mr. Robert L. Baer's letter of September 21, 1979.
1144 356