ML19209C397
| ML19209C397 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/01/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 7910150275 | |
| Download: ML19209C397 (1) | |
Text
T /C-
/
'o UNITED STATES
~,,
8"
)
g n
NUCLEAR REGULATORY COMMISSION E
REGION 111 1h I
0 799 ROOSEVELT ROAD b/
g oLEN ELLYN. lLLINOIS 60137 Fi 1 P.,!3 Docket No. 50-341 The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
Thank you for your interim report dated September 24, 1979, pursuant to 10 CFR 50.55(e) regarding damaged penetrations. We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely, s
<W di G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr., Attorney 1146 326 r
7910150]