IE Insp Rept 70-0698/79-01 on 790613-14.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Operation, Shipping & Receiving,Storage & Control,Physical Inventory, Records & Repts
ML19209C313
Person / Time
Site: 07000698
Issue date: 08/08/1979
From: Joyner J, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19209C312 List:
References
70-0698-79-01, 70-698-79-1, NUDOCS 7910120521
Download: ML19209C313 (4)


Text

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.

70-698/79-01 Docket No.70-698 License No.

SNM-770 Safeguards Group 2 Licensee.

_ estinghouse Electric Corporation W

Advanced Reactors Division Nuclear Energy Systems P. O. Box 355 Pittsburgh. Pennsvlvania 15235 Facility Name:

Waltz Mill Site Inspection At: Monroeville Nuclear Center & Waltz Mill Site Inspection Conducted: June 13 and 14,1979 Date of Last Material Control and Accounting Inspection Visit:

July 28, 1978 Type of Inspec io : ) Unannounced Material Control and Accounting Inspectors:

_ O. 4,J

/S9 G. C. Smith, Auditor Dater //

Date Date Approved by: NS A N 2_ /

P/K/79 Jf H. Joyney CMef, Nuclear Material Dat'e e Contvol Support Section, Safeguards Branch Inspection Summary:

Areas Inspected:

Facility Organization, Facility Operation, Shipping and Receiving, Storage and Internal Control, Physical Inventory, and Records and Reports.

The inspection involved 16 inspector-hours onsite by one NRC regional based inspector and was begun during regular hours.

Results:

No items of noncompliance were identified.

j,-}

'1~

','9101200)

DETAILS 1.

Persons Contacted

  • R. Tschiegg, Manager, Nuclear Materials Management and Safeguards
  • D. T. Galm, Manager Engineering Services R. G. Kitzer, Manager Industrial Hygiene and Safety F. R. Cicco, Senior Chemistry Technician Z. L. Kardos, Senior Scientist
  • denotes those attending exit interview.

2.

Licensee Action on Previous Inspection Findings There were no items vf noncompliance noted in the previous inspection (Report 78-03).

3.

Exit Interview The inspector met with the licensee representatives (Denoted in Paragraph 1)onJune 14, 1979 at the Waltz Mill Site to summarize the purpose, scope and findings of the inspection.

4.

Unresolved Items There were no unresolved items noted during the inspection.

5.

Independent Inspection Effort - No items of noncompliance noted. The inspector conducted a walk-through inspection of the analytical labora-tories and outdoor storage area to observe operations and activities in progress.

Postings, signs and adherence to radiological safety and material control procedures were reviewed.

6.

MC 85202B - Facility Organization - No items of noncompliance noted.

The inspection results were attained through discussions with licensee manage-ment and review of licensee's organization charts and procedures.

7.

MC 85204B - Facility Operation - No items of noncompliance noted.

The inspection results were attained through a review of the licensee's opera-tional procedures. The inspector determined that the licensee's SNM control procedures are adequate to ensure administrative and physical control of SNM and the licensee is confining his possession of SNM to the locations and purposes authorized by his license.

The activity for the period covered by this inspection is shown in Exhibit I of this report.

- ~

I

3 8.

MC 852088 - Shipping and Receiving - No items of noncompliance noted.

The inspection results were attained through a review of all Forms NRC-741, Nuclear Material Transaction Reports, prepared since the last inspection, against criteria for preparing / completing the form, including: complete-ness, accuracy, back up data, timely dispatch and posting in accountability ledger.

9.

MC 85212B - Physical Inventory - No items of noncompliance noted.

The inspection results were attained through review of procedures and physical inventory documentation letters to ensure physical inventories were taken at required frequencies and inventory results were reconciled to the book inventory. The results of the physical inventory taken in January 1979 were independently tested by locating and verifying, on a sample basis, items on inventory.

10.

MC 85216B - Records and Reports - No items of noncompliance noted.

The inspection results were attained through an audit of the material control records and reports for the period April 1, 1978 through March 31, 1979 to determine compliance with 10 CFR 70.42, 70.51(b), 70.53, and 70.54.

The Material Status Reports (Form NRC-742) submitted by the licensee for the periods ending September 30, 1978 and MarcF 31, 1979 were reviewed to the above requirements. Shipments and inventory levels were also reviewed as addressed in Paragraphs 8 and 9.

11.

Attachments Exhibit I - Material Balance 9 mmary for the period of 4-1 3-31-79.

i,')

2_'

EXHIBIT I Westinghouse Electric Corporation Waltz Mill Site Material Balance Summary 4-1 3-31-79 RIS:YLE Enriched Uranium (grams)

Plutonium (grams)

U-233 (grams)

U U-235 Pu Pu-239&241 U

U-233 Inventory 4-1-78 4975^

1614 3

3 Receipts 3801 146 0

0 Material to Account for 53551 1762 3

3 Removals:

Shipments 40268 1265 0

0 0

0 Discards (Burial) 7862 260 0

0 G

0 ID 0

-1 0

0 0

Total Removals 48130 1526 0

0

- - ~

0 0

0 Inventory @ 3-31-79 5421 238 3

3 Material Accounted For 53551 1762 2

3

  • = <1 gram Note 1:

Explanation of Enriched Uranium ID:

To account for rounding differences on physical inventory of 1-23-79.

Book Value Elem 135 g ISO 17 g Physical Inv. Value Elem 135 g ISO 18 g Diff 0

+1 Note 2:

There was no enriched uranium, and less than 0.5 grams Pu, held at Waltz Mill under RIS CCU during the period 4-1-78 to 3-31-79.

s t

./