ML19209C311

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-0698/79-01 on 790613-14.No Noncompliance Noted
ML19209C311
Person / Time
Site: 07000698
Issue date: 08/24/1979
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fillnow R
WESTERN NUCLEAR, INC., WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML19209C312 List:
References
NUDOCS 7910120518
Download: ML19209C311 (2)


Text

Vf UNITED STATES ptRECOg o

NUCLEAR REGULATORY COMMisslON

[

REGION I o

,h 631 PARK AVENUE

'C KING OF PRUS$tA. PENNSYLVANIA 19406

\\...../

AUG 2 41979 Docket No.70-698 Westinghouse Electric Corporation ATTN: Mr. R. H. Fillnow, General Manager Advanced Reactors Division Nuclear Energy Systems P. O. Box 355 Pittsburgh, Pennsylvania 15235 Gentlemen:

Subject:

Inspection 70-698/79-01 This refers to the inspection conducted by Mr. G. C. Smith of this office ca June 13-14,1973, at the Monroeville Nuclear Center and the Waltz Mill Site, of activitis, authorized by NRC License No. SNM-770 and '.o the discussions of our findings held by Mr. Smith with Mr. D. T. Galm of you st ff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Wi;hin these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of ncncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-tion report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.

Any such applica-tion must be accompanied by an affidavit executed by the owner of the infonna-tion, which identifies the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b) (4) of Section 2.790. The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

l.

T9101205tt

S4 Westinghouse Electric Corporation 2

No reply to this letter is required; however, should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, C

/

Walter G. Martin, Chief Safeguards Branch

Enclosure:

Office of Inspection ar.d Enforcement Inspection Report Number 70-698/79-01 cc w/ encl:

D. T. Galm, Manager, Engineering Services R. P. DiPiazza, NES License Administrator 4

1 9

I i J