Responds to NRC 790816 Ltr Re Violations Noted in IE Insp Repts 50-352/79-04 & 50-353/79-04.Corrective Actions:Valve Cleaned & Inspected & QC Engineers Trained in Job Rule Requirements
ML19209C252
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/12/1979
From: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19209C250 List:
References
NUDOCS 7910120271
Download: ML19209C252 (2)


Text

,

% e-e . .

/

' ~

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHI A. PA.19101 V.S.BOYER vica.eassicant Mr. Boyce Grier, Director #2 ', l' United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406

Subject:

USNRC IE Region I Letter dated August 16, 1979 RE: Site and Office Inspection of April 10-12, 1979 Inspection Report No. 50-352/79-04 and 50-353/79-04 Limerick Generating Station - Units 1 5 2 File: QUAL 1-2-2 (352/79-04 and s33/79-04)

Dear Mr. Grier:

In response to the subject letter regarding items identified during the subject inspection of construction activities authori::ed by NRC License Nos. CPPR-106 and -107, we transmit herewith the following:

Attachment I - Response to Appendix A Should you have any questions concerning these items, we would be pleased to discuss them with you.

Sincerely, j/?

/V./J &&cwm

'/

V. S. Boyer JMC/mmk Attachment il39 '15 g1/ 4 7910120

a APPENDIX A NOTICE OF VIOLATION Item of Noncompliance Appendix B of 10 CFR 50, Criterion V, states, in part: " Activities affecting quality...shall be accomplished in accordance with these instructions, procedures or drawings."

The Limerick PSAR, Appendix D, Quality Assurance Program, Pa zagraph D.6.4, states, in part, that: "Bechtel Construction Department...

is responsible for construction of the plant to approved engineering specifications, d.rawings, and procedures..."

Bechtel Power Corporation job rule for welding 8031-HR-G-16 states, "Do not weld or burn unless al.1 exposed material is adequately pro-tected. Particular attention shall be provided the area below your weld."

Contrary to the above, on April 12, 1979, a primary steam isolation valve (B21-1-F022) which is locat 'd just balow a feedwater pipe joint in the process of being welded, wt not adequately covered to protect it from the welding activities. TL 3 valve was subjected to weld slag, weld grinding dust and dirt.

Response to Item of Noncompliance The subject valve was cleaned and inspected and found to be in an acceptable condition and then the valve was adequately recovered.

In order to avoid further items of noncompliance, the welding Quality Control discipline held a training session to fr.miliarize discipline Quality Control Engineers with the requirements of job rule 8031-JR-G-16. Additionally, the Project Superintendent issued a memo to all responsible Superintendents to remind them of the requirements of the job rule.

1 *7 '1 /

l i s, Q< 'U I-1/1 352/77-04 353/75-04