ML19209C230
| ML19209C230 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/10/1979 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19209C231 | List: |
| References | |
| GD-79-2534, NUDOCS 7910120228 | |
| Download: ML19209C230 (2) | |
Text
I
@@@A Carchna Power & Light Company October 10, 1979 FILE: NG-3514 (B)
SERIAL NO.: GD-79-2534 Office of Nuclear Reactor Regulation Attention:
Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 3 United States Nuclear Regulatory Commission Washington, D.C.
20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-324 LICENSE NO. DPR-62 TECHNICAL SPECIFICATION CHANGE FOR MCPR CORRECTION
Dear Mr. Ippolito:
A review of the nuclear input parameters used in the analysis for the Brunswick Steam Electric Plant (BSEP) Unit 2, Reload 2, non-RPT license submittal disclosed that an error existed in the end-of-cycle (EOC) MCPR limits. This was reported to NRC in an August 27, 1979 conference call by Carolina Power & Light Company (CP&L) and General Electric (GE). The error resulted from erroneously using the beginning-of-cycle (BOC) void coefficient data for the end-of-cycle calculations. The attached Supplemental Reload License Submittal. NE30-24182A, Revision 1, August 1979, provides the bases for revising the existing technical specifications for the period E0C-2000 MWD /t to ECC. The correct MCPR values are as follows:
Fuel Type Was Should Be 7x7 1.21 1.22 8x8 1.27 1.29 8x8R 1.27 1.29 As discussed in the August 27, 1979 conference call, CP&L and GE confirmed to NRC that the MCPR limits for BOC to L C-2000 MWD /t are correct.
Attached you will find the revised technical specification page which incorporates the corrected MCPR limits as indicated by a vertical bar in the right hand margin.
Fuel exposure estimates show that Unit 2 should reach EOC-2000 MWD /t on October 15, 1979. Therefore, please address this technical specification change request on an expedited or emergency basis so that the change can be implemented by CP&L on October 15.
1144 321
? 910 y gg 3,79 a== n ~ = ~ _ _
411 Faya"ed o Street
- P O Box 1551
- Pawgh N C 27C02 CMEisn2 tmwi2:ISTZM?:rI C2nEl 4 s
I l
Mr. T. A. Ippolito In accordance with 10 CFR 170.12(c), we have determined that this request constitutes one Class III amendment because it involves a single technical issue.
Therefore, our check for $4,000 is enclosed as payment of this fee.
Should you have any questions, please contact my staff.
Yours very truly, 7 - '
\\
,..('?'hhy
?
E. E. Utley Executive Vice President Power Supply & Customer Services x
EEU/j cb Attachments Sworn and subscribed before me this 10th day October,1979.
Nomi/
Notary Public g
My Commission Expires: October 4, 1981 c
=
=
3 ygOTARy.i k
5, #UBLIC f f
'$$hiif*$hY
- f tsg g g g gtLO 1144 522
_ _ _ _.