Responds to NRC Re Violations Noted in IE Insp Rept 70-0371/79-08.Corrective Actions:Zone Marking and Work Desk Locations Modified to Meet Zone Requirements
ML19209C152
Person / Time
Site: 07000371
Issue date: 08/22/1979
From: Ganley D
UNITED NUCLEAR CORP., UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
To: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19209C151 List:
References
NUDOCS 7910120072
Download: ML19209C152 (2)


Text

UnC NAVAL PRODUCTS D v s.on of Unad Nac: ear Co corat en 67 Sancy Cesert Acad Te'erncre 203:843-1511 A unc RESOURCES CCmpar UFC3Sule Ccnrect. cut 06382 y

August 22, 1979 George H. Smith, Chief Fuel Facility and Material Safety Branch U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Inspection 70-371/79-08 Ref: Letter, G. H. Smith, NRC to D. E. Ganley, UNC, dated July 31, 1979

Dear Sir:

In reply to the referenced letter:

Appendix A and Section 3; 2nd paragraph of details:

Criticality Safety Authorization 1.

Corrective Steps Which Have Been Taken and the Results Achieved Zone marking and work desk and table locations have %en modified to meet posted zone requirements. The noted operations were not in process at the time of inspection.

2.

Corrective Steps Which Will be Taken to hoid Furthsr Itrms of Non-Compliance-Shop II Metals Processing personnel and the Shop : Criticality Coordinator have been reinstructed of the necessity to strictly comply with posted zone requirements. NIS personnel shall assure that postings are clearly understood by area personnel, and com-pliance shall be audited during periodic NIS inspections. Wherever possible, the performance of the actual operation shall be part of the inspection.

A special series of NIS inspecticns of B-South controlled area operations shall be performed during the remainder of this year.

1143 093 OP 7910120 1

LJr1C:

U.S. Nuclear Regulatory Commission August 22, 1979 3.

The Date When Full Compliance Will be Achieved Our facility is currently in full compliance.

Section 3, Paragraph 3 of Details Storage of Used Protective Clothing for Reuse We will evaluate the noted comments and inform NRC inspectors of our planned actions on their next visit.

Section 5, Page 8, Paragraph 2 of Details Use of Work Permits Availability of fire extinguishers and the plant emergency phone number shall be incorporated in Work Permit attachment

  1. 6 at r. ext revision.

Section 6, Page 9, Last Paragraph of Details Priority to Correction of Safety Items The time period required for correction of safety inspection items varies according to many factors e.g. degree of hazard, precurement time, availability of necessary personnel, amount of work time needed, and equipment availability.

We believe our excellent personnel and facility safety records confirm our methods are satisfactory.

Very truly yours, D. E. Ganley President and General Manager UNC Naval Products