Ack Receipt of NRC 790808 Ltr Re Adequacy of Station Electric Distribution on Sys Voltages.Review Currently Underway Indicated Onsite Distribution Sys Adequate to Start & Operate Required Safety Loads
ML19209B979
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/08/1979
From: Moore G
FLORIDA POWER CORP.
To: Gammill W
Office of Nuclear Reactor Regulation
References
3--3-2-3, 3-0-3-2-3, NUDOCS 7910110347
Download: ML19209B979 (3)


Text

.

s ooo e "o I MOOS i,4l05098

  • doones0 bey Florida Power C 0 R P O R A T 'O m October 8, 1979 File: 3-0-3-2-3 Mr. William Gammill Acting Assistant Director for Operating Reactors Projects Division of Operating Reacto:s U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crptal River lf. it 3 .

Docket No. 50-302 Operating License No. DPR-72 Re: ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES

Dear Mr. Gammill:

In response to your letter dated ALgust 8,1979, we are currently reviewing our electric power systems at CR#3. To date, we have reviewed the original calculations and analyses which provided the original design and specification data. This review has indicated that the on-site distribution system while powered from the offsite power system (Unit 3 Startup Transformer) is adequate to start and operate all required safety loads under the condi-tions stated in the August 8 letter. This conclusion was veri-fied during the Turbine / Reactor Trip Test during which all on-site loads were transferred to the offsite source. The test and results are described in Section 4.6 of the Crystal River Unit 3 Startup Report, dated July 27, 1977.

Since the original design and startup of the plant, there have been several modifications / additions to the on-site distribution system. We expect that the impact of these are insignificant relative to the overall system, but it does warrant a closer review. Also, we desire to collect and use some actual field data for various loads which will provide the most acce. ate data to use for our analyses. Additional testing may also be desired for further verification.

jjgq /

7g3 w

To collect this data, perform the additional analyses, and possi-ble testing will require additional time. We will provide the results of all our reviews and tests on this subject by d November 19, 1979, in accordance with the August 1,egte.0377' General Office 32o1 inirty-fourth street soutn . P O Box 14o42. St Petersburg. Florida 33733 813 - 866-5151

Mr. William Gamill Page Two October 8, 1979 If you have any questions concerning this subject, please contact us.

Very truly yours, FLORIDA POWER CORPORATION

,!k kS G. C. Moore Assistant Vice President Power Production WPSekcR07(D74) 1129 284

STATE OF FLORIDA COUNTY OF PINELLAS G. C. Moore states that he is the Assistant Vice President, Power Production, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Cmmission the information at^ ached hereto; and that all such statements made and matters set tbrth therein are true and correct to the best of his. knowledge, infcnnation and belief.

t- -

(

G. C. Moore Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 8th day of October,1979.

0 Notary Public Notary Public, State of Florida at Large, My Commission Expires: August 8, 1983 CameronNotary 3(D12) 1127 285