Submits Info Re Apparent Casting Defect in Shaft Containing Auxiliary Feed Pump Motor 3AF-P2A.Vendor Will Investigate & Determine Corrective Action
ML19209B789
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/25/1979
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-78-153-000 NUDOCS 7910100465
Download: ML19209B789 (2)


Text

~

(h

$h []

~

VepCO

__c---

September 25, 1979 Serial No. 784 Mr. James P. O'Reilly, Director Office. of Inspection & Enforcement PSE&C/JMD:adw:mc

~

U.S. Nuclear Regulatory C.

'ission Docket Nos. 50-404 Region II 50-405 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

On September 20, 1979, a report was made under the provisions of 10CFR50.55(e) concerning an appare;)t casting defect in the shaft bearing houting for tile North Anna Unit 3 Auxiliary Feed Pump Motor 3AF-P2A.

' accor' dance with the reporting requirements of 10CFR21, the following information is submitted:

A.

Name and address of reporting individual:

Mr. E. A. Baum, Executive Manager Licensing and Quality Assurance Virginia Electric and Power Company P. D. Box 26666 Richmond, Virginia 23261 B.

Facility, activity and/or component affected:

North Anna Power Station, Units 3 and 4 Auxiliary Feed Pump Motors C.

Name of firm constructino the facility or supplying the component, activity or service:

Bingham-Williamette Co.

2800 N.W. Front Avenue Portland, Orego.

97210 D.

Description of defect, deficiency, or failure to comply:

Oil leakage from a motor housing led to an investigation t..c. showed a defect in the casting for the lcwer reser-voir of shaf't drive end bearing on motor 3AF-P2A.

Visual inspection of three other similar motors shows a possible defect in North Anna Unit 4 motors 4AF-P2A and 4AF-P28.

1124 01S to 791005I0 g {

~

Mr. James P. O'Reilly 2

The vendor has been notified and a representative is scheduled to provide.on-site inspection to determine corrective action to be taken.

E.

Date of determination of reportability:

' September 20, 1979 F.

Similar components, activities, or services:

None.

G.

Corrective action which has been, is being or will be taken, the individual responsible and the length of time to complete the action:

The vendor's representative is scheduled to the joo site foi-an investigation and the results will determine the corrective action to be taken and the tim. to complete.

H.

Other information:

None.

Any information not available at this time will be submitted in a follow-

~

up letter as a 30-day report.

Should you require further information, please/ contact thi office.

d Ve trely-your,

I h(W S',

. Brow,n,, Jr.

Senior ice President-Pow r tation gineering and Cons't3 ction

, ~/

-cc:

Director, Office of Inspection and Enforcement (3)

'i124 016

ATTACED IS A PART 21 REPORT FROM IE FMI!' UNIT - ROOM 359E/W PART 21 IDENTIFICATION NO.W - / E? -M r CPPNh' NVE iL/Lc2 DATE OF ETER 7/JSW9 900ET NO, 43 9e V, fd -%f'-

DATE DISTRIBLITED f/o?7/~7GORIGINAL REPORT SUPPlDBfTARY[

DlSTRIBUTION:

PEACTOR(R)Z FUEL CYCE &

SARGUARDS(S)]

t%TERIALS(FD NRR/ DOR, DIRECTOR AD/FFMSI-AD/SG-IE NRR/DRi DIRECTOR g.SS/ FOE AD/ROI AD/RDI ( 2 )

PEGIONS REGIONS AD/RCI IE FIES NRR/IOR,DIPECTOR PEGIONS PDR ffES/SG SS-881 IE FIES (2)

CBfiPAL FIES LPDR PDR CBfTPAL FIES-SS-395

[fDR

~

CBffPAL FIES (CHP30 CBriRAL FIES(CHRON)

TEPA FDR (016) li FIES (2)

LPDR GfTPAL FIES 016 h

M3 DBMG, f?A CB4TPAL FIES (CHRON) 303DSDIG,BPA CBfiPAL FIES - SS-395 ACTION:

B03 DBElIG, IPA PRELIMINARY EWALATION OF THE ATTACHED REPORT INDICATES FOLLOd-U? AS SH3rd BEL 0d:

1F_

E II'ES OT}ER

@el SG FFMSI 1124 017

~

rei: y. 3/r/79

,