ML19209B773

From kanterella
Jump to navigation Jump to search
Forwards LER 79-060/03L-0
Date released: 08/11/2019 Download: ML19209B773


LER 79-060/03L-0:on 790916,differential Pressure Transmitter Failed to Respond to Test Signal.Caused by Transmitter Capsule Failure.New Transmitter Ordered
ML19209B775
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/02/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209B775 (1)
Forwards LER 79-060/03L-0
ML19209B772
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/02/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209B772 (1)