ML19209B669
| ML19209B669 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/01/1979 |
| From: | Bodtke P CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML19209B664 | List: |
| References | |
| NUDOCS 7910100296 | |
| Download: ML19209B669 (4) | |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-255 DATE 10/1/79 C051PLETED BY PJBodtke TELEPHONE 616-764-8913 OPERATING STATUS
- 1. Unit Name:
Pu11sades N I'5 790901 - 790930
- 2. Reporting Period:
2530
- 3. Licensed Thermal Power (SIWt):
811.7
- 4. Nameplate Rating (Gross SlWe):
- 5. Design Electrical Rating (Net 31We):
805
- 6. 51aximum Dependable Capacity (Gross 51We):
- 675
- 635
- 7. Slaximum Dependable Capacity (Net 31We):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted. If Any (Net 51We):
- 10. Reasons For Restrictions,if Any:
This alonth Yr. to-Date Cumulative 720 6551 66 222 i1. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 174.1 5368.9 39,564.8
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 174.1 5244.5 37,426.3
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (SIWH) 322,368 12,046,848 71,511,480
- 17. Gross Electrical Energy Generated (51WH) 94,570 _,
3,433,264 20,670,775 3,640,590 22,032,230
- 18. Net Electrical Energy Generated (31WH) 87.599
- 19. Unit Service Factor 24.2 80.1 54.9
- 20. Unit Availability Factor 24.2 80.1 54.9 19.2 82.5 47.7
- 21. Unit Capacity Factor (Using.NIDC Net)
- 22. Unit Capacity Factor (Using DER Net) 15.1 65.1 37.6
- 23. Unit Forced Outage Rate 0
12.7 36.3
- 24. Shutdowns Scheduled Over Next 6.\\1onths (Type. Date,and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
December 1. 1979
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved
(
INITIA L CRITICALITY
(
INITIA L ELECTRICITY CO.\\1\\1ERCI A L OPER ATION
- Based on Condenser Backpressure 7910$0
' 1 0/77) 1l35 150
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 UNIT Palisades DATE 10/1/79 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTli September 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 582 g7 2
588
,g 3
583 19 4
584
~
20 575
~
21 6
479 22 7
238
~
23 8
22
~
24 9
25
~
10 26 1I
~
27 12 28 l3
~
29 14 30 I5 31
~
16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.
(9/77) 1135 151
(
f i
UNIT SilulDOWNS AND POWER REDUCTIONS DOCK ET NO.
50-255 UNIT N AME _ Palisades DATE 10/1/79 REPORT MONTil Sept. 1979 COMPLETED BY PJBodtke TELEPilONE 616-764-8913 c
c 3?
3 4 Si5 Licensee
,E-r,
{ ".
Cause & Corrective No.
Date g
3g 5,4 jgy Event g, g pV Actionto H
5g=
Reporl #
mU Prevent Recurrence o
g u
o 13 790908 S
545.9 C
1 Refueling Outage I
2 3
4 F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data 13-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-i r~
D Regulatory Restriction 4-Ot her (Explain) 0161)
E Operato Tiaining & License liaamination F Administrative 5
LD G-Operational Ee ror (Explain)
N (9/77)
Il-Ot her (E xplain)
I o
i Exhibit 1.Same Source
SUmtARY OF SHUTDOWN EXPERIENCE FOR SEPTEMBER 1979 GENERAL The unit operated during the first eight days of the month; refueling outage began on September 8, 1979.
I135 153
_