Text

.

OPERATING DATA REPORT DOCKET NO.

50-255 DATE 10/1/79 C051PLETED BY PJBodtke TELEPHONE 616-764-8913 OPERATING STATUS

1. Unit Name:

Pu11sades N I'5 790901 - 790930

2. Reporting Period:

2530

3. Licensed Thermal Power (SIWt):

811.7

4. Nameplate Rating (Gross SlWe):
5. Design Electrical Rating (Net 31We):

805

6. 51aximum Dependable Capacity (Gross 51We):
  • 675
  • 635
7. Slaximum Dependable Capacity (Net 31We):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To which Restricted. If Any (Net 51We):
10. Reasons For Restrictions,if Any:

This alonth Yr. to-Date Cumulative 720 6551 66 222 i1. Hours in Reporting Period

12. Number Of Hours Reactor Was Critical 174.1 5368.9 39,564.8
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 174.1 5244.5 37,426.3
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (SIWH) 322,368 12,046,848 71,511,480
17. Gross Electrical Energy Generated (51WH) 94,570 _,

3,433,264 20,670,775 3,640,590 22,032,230

18. Net Electrical Energy Generated (31WH) 87.599
19. Unit Service Factor 24.2 80.1 54.9
20. Unit Availability Factor 24.2 80.1 54.9 19.2 82.5 47.7
21. Unit Capacity Factor (Using.NIDC Net)
22. Unit Capacity Factor (Using DER Net) 15.1 65.1 37.6
23. Unit Forced Outage Rate 0

12.7 36.3

24. Shutdowns Scheduled Over Next 6.\\1onths (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

December 1. 1979

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved

(

INITIA L CRITICALITY

(

INITIA L ELECTRICITY CO.\\1\\1ERCI A L OPER ATION

  • Based on Condenser Backpressure 7910$0

' 1 0/77) 1l35 150

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades DATE 10/1/79 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTli September 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 582 g7 2

588

,g 3

583 19 4

584

~

20 575

~

21 6

479 22 7

238

~

23 8

22

~

24 9

25

~

10 26 1I

~

27 12 28 l3

~

29 14 30 I5 31

~

16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.

(9/77) 1135 151

(

f i

UNIT SilulDOWNS AND POWER REDUCTIONS DOCK ET NO.

50-255 UNIT N AME _ Palisades DATE 10/1/79 REPORT MONTil Sept. 1979 COMPLETED BY PJBodtke TELEPilONE 616-764-8913 c

c 3?

3 4 Si5 Licensee

,E-r,

{ ".

Cause & Corrective No.

Date g

3g 5,4 jgy Event g, g pV Actionto H

5g=

Reporl #

mU Prevent Recurrence o

g u

o 13 790908 S

545.9 C

1 Refueling Outage I

2 3

4 F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data 13-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-i r~

D Regulatory Restriction 4-Ot her (Explain) 0161)

E Operato Tiaining & License liaamination F Administrative 5

LD G-Operational Ee ror (Explain)

N (9/77)

Il-Ot her (E xplain)

I o

i Exhibit 1.Same Source

SUmtARY OF SHUTDOWN EXPERIENCE FOR SEPTEMBER 1979 GENERAL The unit operated during the first eight days of the month; refueling outage began on September 8, 1979.

I135 153

_