Forwards IE Insp Repts 50-352/79-05 & 50-353/79-05 on 790507-11 & 17-21 & Notice of Violation
ML19209B434
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/22/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19209B431 List:
References
NUDOCS 7910090711
Download: ML19209B434 (2)


See also: IR 05000352/1979005

Text

.

,

p nra

UNITED STATES

'

o

NUCLEAR REGULATORY COMMISSION

2

o

REGION I

h

631 PARK AVENUE

f

KING OF PRUSSI A PENNSYLVANIA 19406

s.....J

Docket Nos. 50-352

AUS 2 21979

50-353

Philadelphia Electric Company

ATTN: Mr. V. S. Boyer

Vice President

Engineering and Research

2301 Market Street

Philadelphia, PA

19101

Gentlemen:

Subject: Combined Inspection 50-352/79-05 and 50-353/79-05

.

This refers to the inspection cenducted by Mr. J. Mattia and Mr. L. Gage of this

office on May 7-11, 17, 18, and 21, 1979 it the Limerick Generating Station in

Limerick, Pennsylvania and the corporate office in Philadelphia, Pennsylvania of

activities authorized by NRC License Nos. CPPR-106 and CPPR-107 and to the

discussions of our findings held by Mr. Mattia with Mr. Walters and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are deacribed in the Office of Inspection

and Enforcement Inspection Report which is er. closed with this letter.

Within

these areas, the inspection consisted of seluctive examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974. This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within thirty (30) days of ycar receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

1117 011

_

7910090 7//

.

.

Philadelphia Electric Company

2

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheid, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790.

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified perie

the report will be placed in the Public Document Room.

d

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

A 4

J

.

Robert T. Carlson,

ief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of I:ispection and Enforcement Combined Inspection

Report Numbers 50-352, 353/79-05