Forwards Notice of Violation from Insp on 790906-07 & 10.IE Insp Repts 50-445/79-18 & 50-446/79-18 Will Be Sent Later
ML19209B280
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/24/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19209B281 List:
References
NUDOCS 7910090435
Download: ML19209B280 (2)


See also: IR 05000445/1979018

Text

e

,pn atog

yt

_p

UNITED STATES

-

'g

yg

g

NUCLEAR REGULATORY COMMISSION

Q's%)'

c [c

REGION IV

t h' Y

G11 RYAN PLAZA DRIVE, SulTE 1000

D

%

,o

ARLINGTON, T E XAS 76012

September 24, 1979

In Reply Refer To:

-

RIV

Docket No. 50-445/79-18

50-446/79-18

Texas Utilities Generating Company

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection activities performed by our Resident Inspector,

Mr. R. G. Taylor, of activities authorized by NRC Construction Permits No.

CPPR-l'6 and 127 for the Comanche Peak Steam Electric Station, Units 1 and 2,

and to the discussion of the findings by the inspector with members of your

staff on September 6, 7 and 10,1979.

Dur::ag the inspection, it was found that certain activities under your license

app (cc to be in noncompliance with Part 50, Title 10, of the Code of Federal

Redulati.ons.

The itecs of noncompliance and references to the pertinent

requirements are identJCied in the enclosed Notice of Violation.

Details of

these items will be included in an intpection report to be issued in the near

future and identified as Inspection Report No. 50-445/79-18; 50-446/79-18.

This notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 30 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved;

(2} corrective steps which will be taken to avoid further noncompliance; and

(3) the date when full compliance will be achieved.

With regard to the item of noncompliance identified as Item A in the attached

Notice of Violation, in that corrective action was taken immediately after

the deficiency was detected, you are required to respond only to (2) above.

Il14

209

-791 $*

79100904'Iji

.

.

,

Texas Utilities Generating

Company

~2-

September 24, 1979

Should you have any questions concerning this inspection, ve will be pleased

to discuss them with you.

Sincerely,

<h

-

>

W. C. Seid1 , Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

Appendix A, Notice of Violation