ML19209B275

From kanterella
Jump to navigation Jump to search
Amends 58 & 58 to Licenses DPR-44 & DPR-56,respectively, Revising Limiting Conditions for Operation for Containment Atmosphere Dilution Sys,By Permitting Sys to Be Inoperable for a Period of Up to 30 Days
ML19209B275
Person / Time
Site: Peach Bottom  
(DPR-44-A-058, DPR-44-A-58, DPR-56-A-058, DPR-56-A-58)
Issue date: 09/13/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19209B276 List:
References
NUDOCS 7910090431
Download: ML19209B275 (10)


Text

UNITED STATES y"

NUCLEAR REGULATORY COMMisslON j

WASHINGTON, D. C. 20555 7

  • &_%n w'y e

\\; %.d}

PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM AT0tiIC POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICEh' E S

Amendment No. 58 License No. DPR-44 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated September 11, 1979 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regula-tions set forth in 10 CFR Chapter.I; 8.

The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; 0.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicaole recuirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:

(2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 58, are

))]4 J}2 hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

7910 000 4 J /

s 3.

This license amendment is effective as of the date' of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Operating [ Reactors Branch #3 homas p[

hief Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance: September 13, 1979 1114 193