Interim Rept 2 Re Impact Testing of Main Feedwater Pipe Which Had Questionable Test Results.Corrective Action & Investigation Is Being Continued.Next Rept Will Be Submitted on 790823ML19209B052 |
Person / Time |
---|
Site: |
Midland |
---|
Issue date: |
07/26/1979 |
---|
From: |
BECHTEL GROUP, INC., EECBECHA |
---|
To: |
|
---|
Shared Package |
---|
ML19209B032 |
List: |
---|
References |
---|
HOWE-215-79, NUDOCS 7910090046 |
Download: ML19209B052 (6) |
|
|
---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications ML20100B6361985-01-21021 January 1985 Rept on Welding Allegations ML20091K9701984-05-25025 May 1984 Request for Exemption from Branch Technical Position BTP-CMEB 9.5-1 for Control Panels C43 & C44 ML20084M0241984-04-27027 April 1984 Const Implementation Overview,Weekly Rept 46,840423-27 ML20084L9381984-04-19019 April 1984 Main Control Room Fire Analysis & Evaluation for C31 Control Panel ML20083P8971984-04-17017 April 1984 Midland Independent Design Const Verification Program Monthly Status Rept,Number 11 for Mar 1984 ML20087H9031984-03-16016 March 1984 Midland Independent Design & Const Verification Program Monthly Status Rept Number 10 for Feb 1984 ML20081C3731984-02-29029 February 1984 Seismic Margin Review,Miscellaneous Subsystems & Components ML20084F9061984-02-24024 February 1984 Const Implementation Overview,Weekly Rept Number 37, for 840220-24 ML20084F9261984-02-17017 February 1984 Const Implementation Overview,Weekly Rept Number 36, for 840210-17 ML20080M7381984-02-15015 February 1984 Independent Design & Const Verification Program Monthly Status Rept 9 for Jan 1984 ML20084F8941984-02-10010 February 1984 Const Implementation Overview,Weekly Rept Number 35, for 840206-10 ML20086M2541984-02-0909 February 1984 Balance-Of-Plant Class 1,2 & 3 Piping,Pipe Supports & Valves, Vol IX to Seismic Margin Review ML20084F8391984-02-0303 February 1984 Const Implementation Overview,Weekly Rept Number 34, for 840130-0203 ML20083G8741984-01-0404 January 1984 Structural Evaluation of Midland Diesel Generator Bldg: Assessment of Structural Performance Capability & Serviceability as Potentially Affected by Settlement Induced Cracking ML20083G5871984-01-0404 January 1984 Midland Independent Design & Const Verification Program: Structural Evaluation of Diesel Generator Bldg ML20079E6641983-12-31031 December 1983 Midland Independent Design & Const Verification Program, Monthly Status Rept 8 for Dec 1983 ML20083D9831983-12-0909 December 1983 Auxiliary Bldg Crack Mapping Evaluations for Grillage 8 Initial Jacking & Rejacking ML20083C6631983-11-30030 November 1983 Midland Independent Design & Const Verification (Idcv) Program, Monthly Status Rept 7 for Nov 1983 ML20081J2801983-10-31031 October 1983 Evaluation of Change & Nonconformance Documents,Independent Assessment of Underpinning ML20082A9691983-10-31031 October 1983 Midland Independent Design & Const Verification Program, Monthly Status Rept 6 for Oct 1983 ML20085L1141983-10-17017 October 1983 Fifth Monthly Status Rept for Independent Design & Const Verification Program for Sept 1983 ML20082G4971983-09-20020 September 1983 Midland Summary Rept ML20080E7881983-08-31031 August 1983 Vol IV to Seismic Margin Review:Svc Water Pump Structure Margin Evaluation ML20076C1621983-08-16016 August 1983 Midland Independent Design & Const Verification Program, Monthly Status Rept 3 for Jul 1983 ML20077A7081983-07-31031 July 1983 Rev 3 to NSSS Equipment & Piping, Vol Viii to Seismic Margin Review ML20077H9721983-07-25025 July 1983 Rev 3 to Diesel Generator Bldg, Vol V to Seismic Margin Review ML20076N2391983-07-15015 July 1983 Midland Independent Design & Const Verification Program, Monthly Status Rept 2 for 830528-830630 ML20085D8091983-06-30030 June 1983 Seismic Margin Review,Vol Iii,Auxiliary Bldg ML20072H4981983-06-30030 June 1983 Reclassification of Flued Head Fittings at Midland Plant Units 1 & 2 ML20024D0181983-06-30030 June 1983 Midland Independent Design & Const Verification Program Monthly Status Rept 2, Second Monthly Status Rept for 830528-0630 ML20076G0631983-06-0202 June 1983 Rev 2 to Midland Energy Ctr Spatial Sys Interaction Program/Seismic Mgjec Project Quality Plan ML20071M3581983-05-27027 May 1983 Midland Independent Design & Const Verification Program Monthly Status Rept 1, Covering Period from Project Inception Through 830527 ML20072E5851983-05-27027 May 1983 Independent Design & Const Verification Program,Monthly Status Rept No 1,Period Inception Through 830527 ML20072M2281983-05-18018 May 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 34, for 830508-14 ML20072M2121983-05-10010 May 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 33, for 830501-07 ML20072M2051983-05-0505 May 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 32, for 830424-30 ML20023C6841983-04-30030 April 1983 Vol 5 of Seismic Margin Review:Diesel Generator Bldg. ML20076N2791983-04-30030 April 1983 Revised Visual Insp of Cracks in Containments Near Anchorages in Rooms 110 & 116 ML20023B9021983-04-29029 April 1983 Addendum to 41st ALAB-106 Quarterly Rept,Apr-June 1983. ML20072M1891983-04-27027 April 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 31, for 830417-23 ML20072M1771983-04-21021 April 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 30, for 830410-16 ML20072M1691983-04-15015 April 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 29, for 830403-09 ML20072M1521983-04-0707 April 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 28, for 830327-0402 ML20083D3531983-04-0101 April 1983 Proposal for Third-Party Const Implementation Overview, Midland Nuclear Cogeneration Plant ML20072M1461983-04-0101 April 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 27, for 830320-26 ML20073D6441983-03-31031 March 1983 Control Room Design Review Final Rept ML20073C6111983-03-31031 March 1983 Seismic Margin Review,Midland Energy Ctr Project,Vol II: Reactor Containment Bldg ML20073B9291983-03-31031 March 1983 Quarterly Rept, for Apr-June 1983 ML20072M1341983-03-23023 March 1983 Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 26, for 830313-19 1986-04-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20058L8721992-12-31031 December 1992 1992 Annual Rept,Cpc ML20126D7211992-12-16016 December 1992 Potential Part 21 Rept Re Actual Performance of Rosemount Supplied Bailey Bq Differential Pressure Transmitters Differing from Rosemount Original Spec.Bailey Controls Encl.Evaluation Not Yet Performed ML20246N1221988-12-31031 December 1988 CMS Energy 1988 Annual Rept ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20196J3801987-12-31031 December 1987 CMS Energy Corp 1987 Annual Rept ML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20207R9041986-12-31031 December 1986 CPC 1986 Annual Rept ML20214A0951986-11-14014 November 1986 Insp & Evaluation Re Adequacy of Stabilization Plan,In Response to Util 860701 Request for Withdrawal of Applications to Extend CP & Util Motions Seeking Withdrawal of OL Application ML20215G6801986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20215G5351986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20197H2581986-05-0808 May 1986 Part 21 Rept 135 Re Defect W/Lube Oil Sump Tank Foot Valve of Standby Diesel Generator.Caused by Extrusion of Liner Matl Due to Overpressurization.Corrective Actions Being Developed.List of Affected Sites Modified ML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications ML20205N6811986-04-14014 April 1986 Final Part 21 & Deficiency Rept 86-03 Re Consolidated Pipe & Valve Supply,Inc Certified Matl Test Repts.Initially Reported on 860321.Six raised-face Orifice Flanges Statused & Segregated Per QA Procedures ML20205N7381986-04-14014 April 1986 Interim Deficiency & Part 21 Rept 86-02 1 Re Elastomer Liner in Clear Flow Co Foot Valves Used in Lube Oil Sump Tanks of Tdi Diesel Generators.Initially Reported on 860321. Action Will Not Be Pursued Unless Facility Reactivated ML20140H5991986-03-24024 March 1986 Second Interim Deficiency Rept 86-01 Re Error in Bechtel Computer Analysis Program.Initially Reported on 860121.No Corrective Actions Will Be Pursued & No Further Repts Will Be Submitted Unless Project Reactivated ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153F5391986-02-14014 February 1986 Interim Part 21 & Deficiency Rept Re Error in Bechtel Computer Analysis Program ME101.Initially Reported on 860121.No Corrective Actions or Further Repts Will Be Submitted Until Project Reactivated ML20137N6101986-01-10010 January 1986 Interim Part 21 & Deficiency Rept 85-08 Re Isolated Failures of Betts Spring Co Intake & Exhaust Valve Springs Reported by Tdi.Initially Reported on 851218.Corrective Actions Will Be Pursued If Units Reactivated ML20141N8361985-12-31031 December 1985 CPC 1985 Annual Rept ML20138M3891985-12-12012 December 1985 Topical Rept Evaluation of Rev 1 to BAW-1847, Leak Before Break Evaluation of Margins Against Full Break for Rcs.... Rept Presents Acceptable Justification to Eliminate Dynamic Effects of Large Ruptures in Piping ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20138B9531985-10-0909 October 1985 Interim Deficiency Rept Re Larger than Anticipated Util Movement Where Freezewall Crossed safety-related Utils at Monitoring Pits 1,2,3 & 4.Initially Reported on 850917.No Action Will Be Taken ML20138C3111985-10-0808 October 1985 Interim Deficiency Rept Re Limitorque motor-operated Butterfly Valves Not Opening Electrically After Closed Manually.Initially Reported on 850912.No Corrective Actions Will Be Taken Unless Facility Reactivated ML20138C3251985-10-0808 October 1985 Interim Deficiency Rept Re Loose Set Screws on Anchor Darling Swing Check Valves & Disc Nut Pin Problems Causing Inoperability.Initially Reported on 850912.No Further Corrective Action Will Be Taken Unless Facility Reactivated ML20132B0261985-09-0303 September 1985 Part 21 Rept Re Possibility of Engine Ingestion of Unwelded Part in American Air Filter Standby Diesel Generator Intake Silencer.Immediate Hold Should Be Placed on Diesel Engines/Intake Silencers Not Yet in Svc ML20132D3191985-07-10010 July 1985 Interim Part 21 & Deficiency Rept Re Rupture During Testing by Wj Woolley Co of Inflatable Seal,Mfg by Presray Corp,Used in Personnel Air Locks in Reactor Containment Sys.Initially Reported on 850614 ML20129G0601985-04-26026 April 1985 Interim Deficiency Rept Re Potential for Cracking of Check Valves in on-engine Mounted Starting Air Piping of Tdi Diesel Generators.Initially Reported on 850401.Cause Not Determined.No Corrective Actions.Related Correspondence ML20112J3951985-03-22022 March 1985 Interim Part 21 & Deficiency Rept Re Failure of Gulf & Western MSIV Actuator Latch Roller Bearing.Matter Will Not Be Pursued Unless Plants Reactivated ML20100B6361985-01-21021 January 1985 Rept on Welding Allegations ML20114D3571984-12-21021 December 1984 Interim Deficiency Rept Re Diesel Fuel Oil Tank Soils Borings.Initially Reported on 841121.No Corrective Actions Necessary Due to Present Project Shutdown ML20100K9791984-11-27027 November 1984 Part 21 & Interim Deficiency Rept Re Ruskin Mfg Co Interlocking Blade Fire Dampers.Initially Reported on 841121.Corrective Action Will Not Be Pursued & No Further Repts Will Be Made Unless Plant Reactivated ML20100D9841984-11-21021 November 1984 Deficiency Rept Re Diesel Fuel Oil Tank Boring Logs.Util Response to Dow Chemical Co 841113 Request for Admissions Encl ML20100E4451984-11-15015 November 1984 Interim Deficiency Rept Re Cardinal Industrial Products Corp Spare Studs Received W/O Ultrasonic Exam.Initially Reported on 841010.Corrective Actions Will Not Be Pursued Unless Midland Reactivated ML20100E2621984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Rosemount 1153 Series B Transmitters Potentially Leaking.Initially Reported on 841010.Four Units Shipped to Facilities.Corrective Actions Will Not Be Pursued ML20100E2371984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Tdi Fuel Control Level Cap Screws.Initially Reported on 841010.No Corrective Actions Will Be Pursued & No Further Repts on Subj Made Unless Midland Reactivated ML20099E3531984-11-0909 November 1984 Interim Deficiency Rept Re Small Bore Piping Anchor Design. Initially Reported on 840816.Listed Corrective Actions Will Not Be Pursued & No Further Repts Will Be Made Unless Facilities Reactivated ML20093C3211984-10-0101 October 1984 Rev 0 to QA Program Plan for Shutdown Phase ML20093H3961984-08-0202 August 1984 Interim Deficiency Rept Re Seismic Qualification of Power Supplies for Eccas & Ni/Rps Equipment.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20093H8521984-08-0202 August 1984 Interim Deficiency Rept Re Field Installation of Itt Grinnell Struts & Extension Pieces.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20096A7781984-07-27027 July 1984 Final Deficiency Rept Re Defective Capstan Springs in Pacific Scientific Mechanical Shock Arrestors.Initially Reported on 840106.W/o Description of Investigation & Corrective Actions.Related Correspondence ML20093H8111984-07-27027 July 1984 Final Part 21 & Deficiency Rept Re Capstan Springs in Mechanical Shock Arrestors Supplied by Pacific Scientific. All Suspect Shock Arrestor Capstan Springs Will Be Inspected for Cracks & Defective Springs Replaced ML20093H8871984-07-20020 July 1984 Interim Deficiency Rept Re Reactor Coolant Pump Seals & Seal Covers.Initially Reported on 840622.No Activity Currently Being Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20090G2141984-07-18018 July 1984 Idcvp:Control Room HVAC Sys Performance Requirements, Draft Topical Rept ML20093H4751984-07-17017 July 1984 Interim Deficiency Rept Re Core Flood Line Piping Supports in Reactor Pressure Vessel Connection Supplied by Bechtel. Overstressing Could Occur in Pipe Supports.No Commitment Made for Further Repts ML20096A2951984-07-11011 July 1984 Final Deficiency Rept Re Concrete Embedment Design Using Shear Lugs Located Outside Compression Zone.Initially Reported on 821203.Use of Shear Lugs Outside Compression Zone Is Proper Design Technique.Related Correspondence ML20093G7891984-07-11011 July 1984 Final Deficiency Rept Re Concrete Embedment Design Using Shear Lugs Located Outside Compression Zone.No Corrective Action Required.Not Reportable Under 10CFR50.55(e) 1992-12-31
[Table view] |
Text
.
Bechtel Associates Professional Corporation Attach =cnt to 3LC-7942 MCAR 29 Inter 1= Report 2 July 26, 1979 Page 2 Grinnell concedes that its rationale, as de=enstra:ed by the resul:s of Heat N-32762 is not 1007. consistent, and as a result, it believes that other stress-relieved heats =ay also be suspect in relation to the repeatability of the i= pact properties on each piece of equip-
=ent.
Grinnell has rationali:ed that because it did not obtain i= proved Charpy test resul:s for Heat N-32762 stress-relieving, Heat L-20479 cannot be considered :o have the desired i= pact proper:1es (+30F) .
- 2) In May 1979, Grinnell tested'three samples of Heat N-32762. These sa=ples were fro = a f abricated spool whi.ch consisted of a s::aight piece of pipe which was hot-bent, air-cooled, and then full furnace stress-relieved. These sa=ples yielded resul:s of 9, 6, and 17 =11 lateral expansion. Because the sa=ples were taken near the area of the bend, it was thought that they =ay have been fres a heat-affec'ted :ene (an area which had received an inter:ediate heating and coc* ing cycle because of its proxi=ity to the hot bend area) .
~
Grinnell has indicated that =easure=ent of the ac:ual sa=ple location relative to the area which was heated and bent, shows that it was not significantly heated during the bending cycle. Grinnell is preparing a graph of the ta=perature versus distance to show what these sa=ples would have been subject to during the bending cycle.
The graph will be used to deter =ine whether the sa=ples could have been affected by the bending operation.
Grinnell concluded that because the sa=ples were far enough frc=
the furnace cot to ha affected by 1:s hea:, the poor results are because of the material inconsis:ency associa:ed wi:h this particular heat. ,
- 3) Sechtel has performed a docu=enta: ion survey a: the jobsi:e to identify all spools Charpy tes: qualified in hea: ::aa:=en: condi:1on and to confir= tha: those spools identified were in f ac: hea:-
treated. The resul:s of this survey, as rela:ed :o Hea:s N-32762 and L-20479, are :abulated in the at: ached appendix.
Bechtel is s:111 pursuing the acceptabili:y of =a:erial associa:ed with Heats N-32762 and 1-20479 as well as any spools wi:h ho: bend sections. Therefore, the reportable condition of the pipe re=ains uncertain at this ti=c.
? 04 7910090 0
Bechtel Associates ProfessionalCorporation Attachment to 3LC-7942 MCAR 29 -
Interim Report 2 July 26, 1979 Page 3 Forecast Data for Investigation and Corrective Action The next interim report is scheduled for August 23, 1979'.
i Submitted by: b Approved by:, Co. ' /> <"
Concurre.nce by: )
ne</j s 7/12/9 .
O 1.11,9 c u i sos t.
Page 1 of 3 ,
' APPENDIX .
SLY. MARY OF FIELD DOCL7.E;TATION SURVEY FOR REA*S N-32762 AND L-20479 Charpy Tes: Results
- Heat N-32762 Spools Register CMTR Heat-Treated-
- 9 1EL32S638134 MP413 P142 'No-2EL315639133 MR416 P142 Yes .
2EL31S639133A MR416AX P142 Yes 2EL32S639133 IIR424 P142 Yes .
2EL32S639134 MR425 P142 Yes Test Result @ +30F '
As-Received Condition
~ 1s t 2nd 3rd 21 25 29 40 18 30 45 32 Passed s No No Yes
- 1. Heat trea =en: verification was based en review of actual decu=en-tation at the j obsi:e. Hea: trea:=ent censisted of post weld stres s-relieving.
- 2. This spool is currently on hold a: Crinnell Shop.
Secause che :hird :es a: 3CF is considered invalid, disposi:ica ef =a:crial is undeter=ined at :his ci=e. (See Code Acceptance Cri:eria for Charpy Impac: Tes: Resul:s.)
g ,
e
Appendix Page 2 of 3
. Chdepy Test Results Heat L-20479 . .
~
. Spools Register . CfrR Heat-Treated 1 1EL315638134 MP44 , P142 Yes 1EL315638136 M246 P142 Tes 2EL31S639135 MR418 P142 Yes 2ELB2S639135 ER626 P142 Yes 2ELES639136 MR427 P142 Yes Test Results +30F As-Received Condi:ien Stress-nelteved 11757
~ '
1st 2nd 1st Tes:
32 31 30 14 43 29 13 23 29 Passed -
No No .
'Yes
- 1. Ecat treat =cnt verification was based on review of actual docu=en-tation at the j'obsite. Heat treat =ent censisted of post weld stress , relieving.
In accordance with code regula: ions ma:erial, this heat is considered acceptable in the stress-relieved condi: ion. Ecwever, because of incon-sistent results wi:h other hea:s af:er stress-relieving, Grinnell considers these resul:s. questionable. Disposition of :his =acerial is considered undetermined at this ti=e.
Spools Consis:ing of a Ccebination of Heats N-32762 and L-20479 3oools Racis:er CMTR Hea:-Trea:ed IEL315638133 M243 P142 Yes lEL325638133 MP412 P142 Yes lEL325638136 MP414 P142 Yes 3ecause these spools are combina:icas of unaccep able hea:s, : hey are not acceptable.
.. 7/12/9 , 1 1 '1 (l 7Il7
Appendix ,
g At ta c5cei.t to !)LC-79/.; Page 3 of 3
. !! CAR 2') I!!T!'. RIP I4EPORT 2
~
July 26, 1979 Page 6 Code Acceptance Criteria for Charpy Impact Results in Accordance with ASME Code,Section III,1971 Edition Through Su==c: 1973 Addenda
- 1) Acceptance tests consist of a set of three full-size speci= ens.
- 2) Specicens shall have a =ini=u= of 25 =il* lateral expansion.
- 3) Retests (Su==er Addenda,1973)
One retest per=itted at the sa=e te=perature provided:
a) Average values of the test results =eet the =ini=u= require =ents
"# i=u= require-b) Not = ore than one speci=en per test is below the ment c) Specimen not =eeting the =ini=u= require =ents is not icwer than 10 f t/lbs or 5 =ils lateral below specified require =ent d) A retest consists of two additional spec 1= ens taken as close
~
as practical to the failed speci= ens. For acceptance of the retest, both speci= ens shall meet the -hu= require =ents.
e 1119 308 7/12/9