Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required
ML19209A817
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 08/14/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
References
NUDOCS 7910050432
Download: ML19209A817 (1)


Text

/'gn ano UNITED STATES l'

NUCLEAR REGULATORY COMMISSION g k '" /, /.

c REGION 111 o,,

799 ROOSEVELT ROAD

, [

GLEN ELLYN,ILLINOls 60137

  • ..+

AUG141979 Docket No. 50-483 Docket No. 50-486 Union Electric Company ATTN:

Mr. John K. Bryan

~

Vice President - Nuclear P. O. Box 149 St. Louis, MO 63166 Gentleren:

With this Information Notice the Nuclear Regulatory Commission is extending an existing mechanism previously used for informing facility licensees of significant operating events to include informing operator licensees of significant events which could impact on conditions of their NRC licenses.

It is requested that the facility licensee provide copies of this Information Notice to all NRC licensed individuals at the facility. No specific response is requested at this time.

If you have questions regarding this matter plea:;e contact the Director of the appropriate NRC Regional Of fice.

Sincerely, n 0.

(/

~

James G. Keppler Director

Enclosure:

IE Information Notice No. 79-20 cc w/ enc 1:

Mr. W. H. Weber, Manager, Nuclear Construction Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Region I & IV Ms. K. Drey Hon. C. J. Frass, Chairman Missouri Public Service Commission 1127 045 m

C$

7910050'

'S

A e

SSINS: 6870 Accession No:

7908090260 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCD!ENT WASHINGTON, D.C. 20555 August 14, 1979 IE Information Notice No. 79-20 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS

Background:

In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.

These items of noncompliance can generally be characterized as serious or repeated failures to follow reactor operating procedures.

TVo recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.

The purpose of this Information Notice is two-fold:

(1) To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility administrative procedures, cnd (2) To summarize the enforcement sanctions available to the NRC for use against licensed individuals.

Description of Circumstances:

1.

Responsibilities Facil!.ty licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected.

The role of NRC licensed individuals is no less important in the overall Regulatory scheme.

The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety. Reliance on these actions is a part of the defense-in-depth cor cept.

Specifically, the h7C requires that:

(1) Only licensed operators are permitted to manipulate the controls that directly affect reactivi POPR *

~w-

-~

'JPLICATE DOCO'E"T (2) Licensed operators are requir all times during the operatio Intire docurent previously entered