ML19209A803
| ML19209A803 | |
| Person / Time | |
|---|---|
| Site: | Bailly |
| Issue date: | 08/14/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shorb E NORTHERN INDIANA PUBLIC SERVICE CO. |
| References | |
| NUDOCS 7910050418 | |
| Download: ML19209A803 (1) | |
Text
v7C
- pa arouq'o UNITED STATES l' -
/n NUCLEAR REGULATORY COMMISSION j,
- E REGION 111 o,
[
799 ROOSEVELT ROAD d
GL EN ELLYN, ILLINOIS 60137
- ...+
AUG 141979 Docket No. 50-367 Northern Indiana Public Service Company ATTN:
Mr. Eugene M. Shorb Senior Vice President 5265 Hohman Avenue Hammond, IN 46325 Gentlemen:
With this Information Notice the Nuclear Regulatory Commission is extending an existing mechanism previously used for informing facility licensees of significant operating events to include informing cperator licensees of significant events which could impact on conditions of their NRC licenses.
It is requested that the facility licensee provide copies of this Information Notice to all NRC licensed individuals at the facility. No specific response is requested at this time.
If you have questions regarding this matter please contact the Director of the appropriate NRC Regional Office.
Sincerely, 0.
Wf n
ames G. Keppler Director
Enclosure:
IE Information Notice No. 79-20 cc w/ encl:
Central Files Director, NRR/DPH Director, NRR/ DOR PDR Local PDR NSIC TIC Hr. Dean Hansell, Office of Assistant Attorney General 1126 3SB 1 910o3o %
9
SSINS: 6870 Accession No:
7908090260 UNITED STATES NUCLEAR REGULATORY COMMISSION g
OFFICE OF INSPECTION AND ENFORCEMENT 4
WASHINGTON, D.C. 20555 August 14, 1979 IE Information Notice No. 79-20 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS
Background:
In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.
These items of noncompliance can generally be characterized as serious or repeated failures to follow reactor operating procedures. Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.
The purpose of this Information Notice is two-fold:
(1) To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility administrative procedures, and (2) To summarize the enforcement sanctions available to the NRC for use against licensed individuals.
Description of Circumstances:
1.
Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected.
The role of NRC licensed individuals is no less important in the overall Regulatory scheme.
The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety. Reliance on these actions is a part of the defense-in-depth concept.
Specifically, the NRC requires that:
(1) Only licensed operators are pe that directly affect reactivit
{UPLICATE DOCUMENT (2) Licensed operators are requir all times during the operatio Entire document previously entered into syster under:
ANO 1126 359 No. of pages: