ML19209A788

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required
ML19209A788
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 08/14/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 7910050392
Download: ML19209A788 (1)


Text

b UNITED STATES l'

N ' 7, NUCLEAR REGULATORY COMMISSION fc REGION 111 o, I.

[

799 ROOSEVELT ROAD j'

GLEN E LLYN. lLLINOls 60137 Docket Nos. 50-10, 50-237, 50-249, A()G J f gg 50-254, 50-265, 50-295, 50-304, 50-373, 50-374, 50-454, 50-455, 50-456 and 50-457 Commonwealth Edison Company ATTN:

Mr. Byron Lee, Jr.

Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

With this Information Notice the Nuclear Regulatory Commission is extending an existing mechanism previot. sly used for informing facility licensees of significant operating events to include informing operator licensees of significant events which could impact on conditions of their hTC licenses.

It is requested thc.t the facility licensee provide copies of this Information Notice to all NRC licensed individuals at the facility. No specific response is requested at this time.

If you have questions regarding this matter please contact the Director of the appropriate NRC Regional Office.

Sincerely.

h e,

ama: G. Keppler DPrector

Enclosure:

IE Information Notice No. 79-20 cc w/ encl:

Mr. B. B. Stephenson, Mf R. Cosaro, Project Station Superintendent Superintendent Mr. N. Kalivianakis, Central Files Station Superintendent Director, NRR/DPM Mr. N. Wandke, Station Director, NRR/ DOR Superintendent PDR Mr. L. J. Burke, Site Local PDR Project Superintendent NSIC Mr. T. E. Quaka, Quality TIC Assurance Supervisor Anthony Roisman, Esq.,

Mr. R. H. Holyoak, Station Attorney Superintendent Mr. Dean Hansell, Office Mr. Gunner Sorensen, Site of Assistant Attorney Project Superintendent General 1126 309 391 7 910050 Y'

g

?

SSINS: 6870 Acceasion No:

7908090260 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 August 14, 1979 IE Information Notice No. 79-20 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS

Background:

In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.

These items of noncompliance can generally be characterized as serious or repeated failures to follow reactor operating procedures. Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.

The purpose of this Information Notice is two-fold:

(1) To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility administrative procedures, and (2) To summarize the enforce =ent sanctions available to the NRC for use against licensed individuals.

Description of Circumstances:

1.

Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected.

The role of NRC licensed individuals is no less important in the overall Regulatory scheme.

The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety. Reliance on these actions is a part of the defense-in-depth concept.

Specifically, the NRC requires that:

(1) Only licensed operators are permitted to manipulate the controls thatdirectlyaffectreactivig (2) Licensed operators are requir

~

^

all times during the operatior

ntire docurent previously entered

.= syster nder:

fd[87 b

~

1I26 s)U 1

ANO i

No. cf ps es:

4

-=

.