Ack Receipt of 790723 Final Rept Re Weld Quality of Unit 1 Zero Degree Pipe Whip Restraint Structure
ML19209A625
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/13/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 7910050082
Download: ML19209A625 (1)


Text

/

UNITED STATES l'~ -

/n NUCLEAR REGULATORY COMMISSION

{.

4[E REGION lli o,

799 ROOSEVELT ROAD g

b GLEN ELLYN, ILLINOIS 60137 o

Aus) y y Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President - Engineering P. O. Box 5006 Cleveland, OH 44101 Gentlemen:

Thank you for your final report dated July 23, 1979, pursuant to 10 CFR 50.55(e) regarding weld quality of the Unit 1 zero degree pipe whip restraint structure. We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely, N

N G.

ior Cihef Reactor Construction and Engineering Support Branch cc:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Ohio Power Siting Commission Mr. Daniel D. Wilt, Attorney ll09 242 7910050 03L