ML19209A478
| ML19209A478 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 09/20/1979 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19209A479 | List: |
| References | |
| NUDOCS 7910040111 | |
| Download: ML19209A478 (1) | |
See also: IR 05000460/1979007
Text
3
/
e asco
o
UNITED STATES
" , ,
8 '^ .
NUCLEAR REGULATORY COMMISSION
g
p,
,
,
%-
ay
REGION V
0,
1990 N. CALIFORNI A DOULEVARD
%
-
,&g
SUITE 202, WALNUT CREEK PLAZA
9 *e,,*
WALNUT CR E E K, CALIFORNI A 9459G
SEP t0 1973
Docket flos. 50-460
50-513
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: fir. fl. O. Strand
Managing Director
Gentlemen:
Thank you for your letter dated August 28, 1979 informing us of the steps you
have taken to correct the item which we brought to your attention in our
letter dated July 25, 1979. Your corrective actions will be verified during
a future inspection.
Your cooperation with us is appreciated.
Sincerely,
f
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
3 310 o40 l
1089
510
9