ML19209A454

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-341/79-04
ML19209A454
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/24/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19209A455 List:
References
NUDOCS 7910040079
Download: ML19209A454 (1)


See also: IR 05000341/1979004

Text

{{#Wiki_filter:TIC. ' *

'o UNITED STATES ~ , , ! NUCLEAR REGULATORY COMMISSION g a t REGION lli %, [[ ' 799 ROOSEVELT ROAD o, CLEN ELLYN. ILLINotS 60137 SEP 2 41979 Docket No. 50-341 The Detroit Edison Company ATTN: Mr. Edward Hines, Assistant -; Vice President and Manager Quality Assurance Gentlemen: Thank you for your letter dated August 31, 1979, informing us of the steps you have taken to correct the noncompliance identified in our letter of July 31, 1979. On September 19, 1979, additional information was obtained during a telephone conversation between Mr. H. A. Walker of your staff and Mr. F. Jablonski of this office, relative to your actions to preclude further noncompliance. It is our understanding you will perform audits of selected site contractors to assure that prior to close out, all corrective actions (completed dispositions) to Deviation Disposition Requests (DDRs) are verified by inspection. Further, a suitable frame of time (30-60 days) shall pass before performing the audits. We will examine your corrective action during a future inspection. Sincerely, Jb N James G. Kepp er Director cc w/ltr dtd 8/13/79 Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr. Attorney '

. 1089 711 7910040 }}