Text
.*.. t -
~ c. 6 >p A.
\\c f na u
UNITED STATES 4
,og NUCLEAR REGULATORY COMMISSION y)
, g() e < 3 pE WASHINGTON. D. C. 20555 k..s /
August 28, 1979 Docket Nos. 50-259/260/296 Mr. Hugh G. Parris Manager of Power Tennessee Valley Authority 500 A Chestnut Street, Tower II Chattanooga, Tennessee 37401
Dear Mr. Parris:
We are in the proce'ss of reviewing our projected work load with the intent of updating the licensing backlog.
In order to more efficiently utilize our limited resources, we are attempting to identify those action items which have become obsolete; i.e., either the need for the action has passed, or circumstances now exist which do not warrant the expenditure of resources necessary to acccmplish the action.
The attachment to this letter provides a listing from our records of licer. sing activities which were initiated by you and have not been completed. We would appreciate your assistance in identifying those items which are no longer required and can be deleted. We would consider a formal request to withdraw any application that is determined to be obsolete.
The priority we assign these activities is determined primarily by public safety considerations. However, so that we may give proper consideration to your needs, it would be helpful if you assign a priority to the remainder of the items according to their importance to you.
Also, if the attachment does not contain certain licensing actions you have requested, please identify these by reference or provide copies of your original request.
We would appreciate having the list marked up and returned within 30 days of your receipt of this letter. You may contact your 00R project manager if you have any questions or need further discussion.
Your assistance in this regard is appreciated.
S_i nc erel y, m
/
kp Chief Tc Ocerating Reactors Branch #3 Division of Operating Reactors
Enclosure:
A j % }
/, } 9
' icensee Recuestec Ar. tion Items
. fcr Facilicies:
3rewns Ferry cc w/encicsure:
See pace 2
~
po oso $37 g
--e Mr. Hugh G. Parris Tennessee Valley Authority August 28, 1979 cc:
H. S. Sanger, Jr., Esquire General Counsel Tennessee Valley Authority 400 Commerce Avenue E 11B 33 C Knoxville, Tennessee 37902 Mr. Dennis McCloud Tennessee Valley Authority 400 Chestnut Street, Tower II
~~-
Chattanooga, Tennessee 37401 Mr. E. G. Beasley Tennessee Valley Authority 400 Commerce Avenue W 10C 131C Knoxville, Tennessee 37902 Rcbert F. Sullivan U. S. Nuclear Regulatory Commission P. O. Box 1863 Decatur, Alabama 35602 Athens Public Library South and Forrest Athens, Alabama 35611 e
BROWNS FERRY UNITS 1, 2 AND 3 PENDING AMENDMENT REQUESTS Request No.
Subject Date Submitted TVA BFNP TS 74 (RHRSW) 12/6/76 TVA BFNP TS 77 (ASME, Inservice Inspection) 1/28/77 TVA BFNP TS 80 (161-kV line out & licensed 3/21/77 Operator)
TVA BFNP TS 89 (Inservice Inspection Jnit 3) 7/29/77 TVA BFNP TS 90 (Bottled-up Operation) 8/5/77 TVA BFNP TS 92 (Valve lineun changes) 8/23/77 amended 5/12/78 TVA BFNP TS 93 (Fire protection) 9/23/77 partial approval 1/10/78 TVA BFNP TS 101 (NSRB Qualifications) 3/3/78 TVA BFNP TS 107 (HPCI, RCIC, S/0 Tests) 3/22/78 TVA BFNP TS 113 SGTS and valve lineup 8/3/78 TVA BFNP TS 120 (SGTS & RAD control) 1/10/79 TVA BFNP TS 122 (Misce.laneous cleanup 3/1/79 changes)
TVA BFNP TS 123 Miscellaneous cleanup 6/29/79 changes (18 total)
TVA BFNP TS 124 Appendix I 7/20/79 TVA BFNP TS 125 Units 1 & 2 Pump &-Valve 7/20/79 Testing TVA BFNP TS 126 Count Rate Requirements for 7/20/79 SPfi's TVA BCNP TS 127 Unit 3 Reload for Cycle 3 8/6/79 TVA BFNP TS 123 Reactor Vessel Bolt-up 8/6/79 tem erature 1091 216