ML19209A294

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-036/03L-0 & 79-037/03L-0
Date released: 08/11/2019 Download: ML19209A294


LER 79-037/03L-0:on 790906,auxiliary Bldg Battery Verification Was Two Days Late.Caused by Personnel Error. Performance of Surveillance Tests on Scheduled Dates Will Be Discussed W/Affected Personnel
ML19209A309
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/28/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209A309 (3)
LER 79-036/03L-0:on 790903,train B RHR Relief Isolation Valves Closed When Power Was Applied to Actuators to Enable Valve Position Indication.Caused by Pulled Fuses That Forced Output Circuit to Send Signal to Close Valves
ML19209A297
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/28/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209A297 (3)
Forwards LERs 79-036/03L-0 & 79-037/03L-0
ML19209A293
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/28/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209A293 (1)