Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Four Bingham-Willamette Pumps,Model 18X34B Vcm,In Use as Emergency Nuclear Svc Pumps & Decay Heat Seawater Pumps.Pumps Are Not Multistage
ML19209A240
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/10/1979
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7910030210
Download: ML19209A240 (3)


Text

. m@ '

d

[h( %h 5 USNRC R--

T/G

. RE -

Q.

e  ;- ' HT!

~

Q,c-B/%

escet-

] .e , n n-o.c.97 Power CORPOma1scem September 10, 1979 Mr. J. P. O'Reilly, Director U.S. Nuclear Regulatory Comission Office of Inspection and Enforcement 101 North Marietta Street, Suite 3100 Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 I.E. Bulletin 79-15

Dear Mr. O'Reilly:

In response to the subject NRC Bulletin concerning DEEP DRAFT PUMP DEFICIENCIES, the following information is being provided:

1. Crystal River Unit #3 has four (4) pumps which are of the type similar to that specified in NRC Bulletin 79-15. However, these pumps are not multistage.
2. a. Manufacturer: Bingham-Willamette (all four (4) pumps)
b. Model: 18x34B - VCM (all four (4) pumps)
c. Capacity: RWP 2A & 2B RWP 3A & 3B 800 rpm SPEED 800 rpm 14100 gpm FLOW 9700 gpm 143 ft. HEAD 75 ft.

700 hp POWER 300 hp

d. Plant Application: RWP 2A & 2B Emergency Nuclear Services Seawater Pump RPW 3A & 3B Decay Heat Seawater Pump
3. Overall dimensions of pumps:

Pumps Motors 32' 10 5/8" HEIGHT 61" 44" (bell) WIDTH 46" 44" (bell) LENGTH 72.5" 55" diam (sole plate) ,

WPShewF04 iUS7 i10 -

D74 QqOfC$

General Office 3201 in.rty-fourtn street soutn. P O Box 14042, st Petersburg Florca 33733 e 813-866-tJFFICHAL COPY

Hr. J. P. O'Reilly Page 2 September 10, 1979

}

, 4. a. No problems were noted during startup concerning these four pumps.

b. We test each of these pumps each month by:
1. demonstrating operability (motor start and discharge pressure)
2. taking fibration readings and comparing to baseline and previous (velocity)

Also, on a regular ba.,is, C & S Maintenance Consultants, Inc.,

take acceleration readings and do a spectrum analysis on problem areas.

Integrated hour readings are obtained shiftly for each pump. No abnormal maintenance problems have been noted to date.

5. a. Operational Problems:

The only operational problem was decreased discharge pressure (coupled with high vibration) which was corrected by removal of four pieces of wood from the intake by divers.

b. Repair Efforts:

RWP2A

  • Replace packing once Remove wood frorr. intake once RWP2B
  • Rplace packing three times Tighten packing once Remove wood once (same as RWP2A)

RWP3A

  • Replace Packing twice Tighten packing once Unstop drain line once RWP3B
  • Replace packing once
  • Packing is replaced with 2 rings 1/2" #1625
6. a. Trouble free intervals: RWP2A 20 months RWP2B 9 months RWP3A 15 months RWP3B 18 months
b. Approximate integrated hours on pump for this interval:

RWP2A 3792 hours0.0439 days <br />1.053 hours <br />0.00627 weeks <br />0.00144 months <br /> RWP2B 954 hours0.011 days <br />0.265 hours <br />0.00158 weeks <br />3.62997e-4 months <br /> RWP3A 3800 hours0.044 days <br />1.056 hours <br />0.00628 weeks <br />0.00145 months <br /> -

RWP3B 5093 hours0.0589 days <br />1.415 hours <br />0.00842 weeks <br />0.00194 months <br />  :

WPShewF04

.' Mr. J. P. O' Reilly Page 3 September 10, 1979 e

5

c. Once per month each pump is run for approximately one hour or more for an operability check and to acquire vibration-velocity readings.
d. Since all of these pumps are seawater pumps, they do not have a retire. mode and the test load is the same as an inservice load.
e. The longest continuous operation for any one of these pumps is one month. Surveillance Precedures require swapping of normal and backup units for operational checks.
f. The only time one of these pumps have not been available has been when it was tagged out to perform one of the items listed under item Sb, or for C & S Consultants, Inc. , to do special tests.

The additional information requested to be made available at the site is contained in our plant records and microfilm files for your review.

Should you have any questions concerning our response, plese contact this office.

Very truly yours, FLORIDA POWER CORPORATION r1%"/p W. P. Ste wart Manager, Nuclear Oparations WPShewF04 D74 cc: U. S. Nuclear Regulatory Commiseion Of fice of Inspection and Enforcement Washington, D.C. 20555 Attention: Director, Division ?!

,f actor Construction Ins pection U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C. 20555 NRC Of fice of Inspection and Enforcement Division of Re-ator Construction Inspection Washington, D.C. 20555 File Code: 3-0-3-a-3 6

1087 112