Responds to NRC Re Violations Noted in IE Insp Repts 50-269/79-10,50-270/79-10 & 50-287/79-10.Corrective Actions:Changed Reactor Bldg Sump Discharge Valve Control Switch from GE VB203A to Cutler-Hammer 10250
ML19209A116
Person / Time
Site: Oconee  
Issue date: 08/06/1979
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19209A112 List:
References
NUDOCS 7910020565
Download: ML19209A116 (5)


Text

.

o I bl e

PowerBuu.anung'~

422 Sourn Cauncu Srazzr. CaAnx.oTTE, N. C. asa4a AugusW,0109 All,'

Q wn.uu. o., mea.a Vice Patsiotut Ttt t a=ou t:Anta 704 Svtaas PaocuCTion 373-4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 RE: RII:WDJ 50-269/79-10 50-270-79-10 50-287/79-10

Dear Mr. O'Reilly:

With regard to the above referenced inspection report and in response to a request by your staff, the following supplementary resi'onses to Items C and D are provided.

With regard to Item C, revision 6 to NSM ON-00o) was initiated on December 13, 1978. This revision changed the reactor building sump discharge valve control switch from a General Electric VB203A to a Cu,-ler-Hammer 10250. This revision was required because the General Electric switch initially specified did not have the proper contact operation to allow for " start," "stop," and " automatic" operation. Prior to implementation of this revision, Design Engineering was informally contacted on this change.

It is not considered that this change was significant in that the design of the moi.ification was not altered, only the equipment required to effect the design.

As stated in our initial response to this item, it is not considered that an item of noncompliance occurred in this instance.

With regard to Item D, an official interpretation of the applicability of ANSI N45.2.4-1972/IEEE Std. 366-1971, paragraph 2.5.2 has been requested.

It is Duke Power Company's position that an item of noncompliance did not occur in this instance, and that 10CFR50, Appendix B and the applicable standards, taken as complete documents support this position.

liO2 007 The Introduction to Appendix B of 10CFR50 states:

' Nuclear power plants and fuel reprocessing plants include structures, systems, and components that prevent or miti-gate the consequences of postulated accidents that could T0100205 0

.,n su 4-qG/K/:]L/

s Mr. James P. O'Reilly, Director August 6, 1979 Page Two p

cause undue risk to the health and safety of the public.

This appandix establishes quality assurance requirements for the design, construction, and operation of those structures, systems, and components. The pertinent re-quirements of this appendix apply to all activities affect-ing the safety-related functions of those structures, sys-tems and components; these activities include designing, purchasing, fabricating, handling, shipping, storing, clean-ing, arecting, installing, inspecting, testing, operating, maintaining, repairing, Lafueling, and modifying."

Each licensee is required to establish what structures, systems, and compo-nents are safety-related and the quality assurance program is applied to them.

Criterion XIV states:

'hbasures shall be established to indicate by the use of mark-ings such as stamps, tags, labels, routing cards, or other suit-able means, the status of inspections and tests performed upon individual items of the nuclear power plant or fuel reprocessing plant. These measures shall provide for the identification of items which have satisfactorily passed required inspections and tests, when necessary to preclude inadvertent bypassing of such inspections and tests. "

Contrary to the cited item of noncompliance, the status of inepections and tests performed upon individual items of the nuclear power plant shall be indicated by the use of markings such as stamp, tags, labels, routing cards, oj; other suitable means.

The nuclear power plant is composed of, in part, structures, systems, and compo-nents which are safety-related.

Installed safety-related instruments are, by virtue of being part of the system, considered to be part of the nuclear power plant.

On the other hand, weasuring and test equipment, is not part of any particular structure, systen or component, or of the nuclear power plant. Criterion XII is applicable to control of measuring and test equipment.

The approved Qualitj Assurance Program Topical Report incorporates, among other standards, the reqairements of ANSI N45.2.4-1972/IEE Std. 336-1971. The standard was originally

'. construction of nuclear power plants, but with the issuance of Regulatory Guius 1 30, became applicable to operating plants as well.

As stated in our initial response to this item, Section 17.2.12 ofA he QAPTR addresses t

(offline) test and measuring equipment.

Inasmuch as installed instrymentation is con-sidered to be pate of the safety-related system, it is covered by the entire QA pro-gram which is applicable to all safety-related structures, systems, and components.

i102 008

, w - --

hfU U V Id

L Mr. James P. O'Reilly, Director August 6, 1979 Page Three p

This position is not contradicted by subsequent standards issued in this area.

For example IEEE Std. 336-1977 revised IEEE Std. 336-1971 and in Section 2.5.2,

" Calibration and Control," staces:

" Measuring and test equipment used to determine compliance with (installation) specifications shall be controlled in accordance with the requiremen-of IEEE Std. 498-1975."

IEEE Std. 498-1975 states in Section 1.1:

"This standard sets forth the requirements for a calibration pro-gram to control and verify the accuracy of M&TE (measuring and test equipment) which is used to assure that important parts of nuclear power generating stations are in conformance with pre-scribed technical requirements, and that data provided by test-ing, inspection, or maintenance are valid. These important parts include those structures, systems, and components whose satisfactory performance is required; for the plant to ope *ste safely, to pre-vent accidents that could cause undue risk to che health and safety of the public, or to mitigate the consequences of such accidents if they were to occur. This standard is intended to be used in con-junction with American National Standard Quality Assurance Program Requirements for Nuclear Power Plants, ANSI N45.2-1971."

Furthermore, in Section 1.4 of this standard, measuring and test equipment is clearly defined:

' Measuring and Test Equipment (M&TE). Devices or systems used to calibrate, measure, gauge, test, inspect, or control in order to acquire research, development, test, or operctional data; to determine compliance with design, specifications, or other techni-cal requirements. M&TE does not include permanently installed operating equipment Recalling the statements of Criterion XIV of 10CFR50 Appendix B, it is clear that measuring and test equipment is separate from installed instrumentation and that installed instrumentation is not controlled by the requirements of ANSI N45.2.4-1973/IEEE Std. 336-1971, IEEE Std. 336-1977, or IEEE Std. 498-1975.

Reference to installed instrument calibration is also made in Section 5.2.16 of

01) 00 ANS-3.2/ ANSI N18.7-1976.

"Special calibration shall be performed when the accuracy'of either installed or calibrating equipment is questionable. Records shall be made and equipment suitably marked to indicate calibration status.

American National Standard N45.2.4-1972 shall be applied to those activities occurring during the operational phase that are comparable in nature and extent to related activities occurring during construction."

4 n - -

l Vb l

Mr. James P.',O'Reilly, Director August 6, 1979 Page Four p

While the methods for suitably marking installed equipment are not explicitely described, reference is made to ANSI Std. N45.2.4-1972, the content of which has been addressed previously in this response.

It continues to be the pos tion of Duke Power Company that an item of noncom-pliance did not occur in this instance.

V y truly yours, u.a '

Y.

William O. Parker, Jr.

RLG:scs ilc'2 010 y