ML19209A074
| ML19209A074 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/07/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 7910020197 | |
| Download: ML19209A074 (1) | |
Text
i
/'gn May,'#o,j UNITED STATES 8\\
3,,(f' NUCLEAR REGULATORY COMMISSION k M4',.
t REGION 111 g
% *' \\# [e[
o, - '
4 799 ROOSEVELT ROAD GLEN ELLYN ILLINols 60137 Docket No. 50-341 g
7 g, The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manage.-
Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
With this Information Notice the Nuclear Regulatory Commission is e:: tending an existing mechanism previously used for informing facility licensees of significant operating events to include informing operator licensees of significant events which could impact on conditions of their NRC licenses.
This Information Notice is being reissued to correct a word omission and a punctuation error that, when taken together, completely changed the intent of a statement. The changed statement is underlined in the text of the Information Notice.
It is requested that the facility licensee provide copies of this Information Notice to all NRC licensed individuals at the facility. No specific response is requested at this time.
If you have questions regarding this matter please contact the Director of the appropriate hTC Regional Office.
Sincerely, s N W/
/
ames G. Keppler
, Director
Enclosure:
IE Information Notice No. 79-20, Rev. 1 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public 1136 006 Service Commission Eugene B. Thomas, Jr., i.ttorney Q,79100 20 /Q
9 SSINS: 6870 Accession No:
7908220108 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 September 7, 1979 IE Information Notice No. 79-20 Rev. 1 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS
Background:
In the past. NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.
These items of noncompliance can generally be characterized as serious or repeated failures tc, follow reactor operating procedures. Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utilit.y procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.
The purpose of this Information Notice is two-fold:
(1) To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility administrative procedures, and (2) To summarize the enforcement sanctions avai'.able to the NRC for use against licensed individuals.
Description of Circumstances:
1.
Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected. The role of NRC licensed individuals is no less imnortant in the overall Regulatory scheme.
The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety.
Reliance on these actions is a part of the defense-in-depth concept.
Specifically, the NRC requires that:
t re t af t
ac v