f INTERIM REPORT NO. 1 UNISTRUT TYPE 11 ANGER MATERI Al, POTENTI A1,1,Y REPORTABI.E DEFICIENCY NO. 78/03 1.
Description of the Deficiency:
An investigation by Bechtel revealed factory weld separation on Unistrut Part No. P1001 material..This material, back-to-back welded P1001., was discovered to have a factory weld separation from its parent naterial.
II.
Available Information:
hechtel Project Engineering performed a statistical analysi:, of the weld test results and determined that a resintance weld shear test needed.
program was Addit ionally, other name brand st rut material is being evaluated for weld separation problems.
Tests are scheduled to bet;in July 19, 1978.
111.
Final Report Statement:
MPt.1, will make a final report of this deficiency by Nover.ber 15, 1978.
Details of the corrective action taken will be documented in Bechtel's Management Cerrective Action Report (MCAR) No. GGNS-39.